Chapter 2: Server Installation
29
7. Use the six Velcro straps to secure the cables to the CMA. Use a strap on either side of
each joint and one on each U-bracket, inserting it through the slot on the bracket.
8.
Slide the chassis forward and backward in the rack to confirm that the cable
management arm is operating smoothly. If necessary, loosen the straps for smoother
movement.
If at some time you must remove the cable management arm, follow this procedure.
Removing the Cable Management Arm
1. Remove cables from the CMA, releasing the Velcro straps and the red plastic caps.
2. For CMA connector #4, pull the metal release tab toward the center of the rack and slide
the connector toward the rear to release it.
3. For CMA connectors #3, #2, and #1, depress the front edge of the yellow plastic rocker
lock, and slide the connector toward the rear to release it.
Содержание SuperServer 8049U-E1CR4T
Страница 1: ...USER S MANUAL Revision 1 0a SuperServer 8049U E1CR4T...
Страница 31: ...31 Chapter 3 Maintenance and Component Installation Figure 3 1 Removing the Chassis Covers Release Tabs...
Страница 54: ...SuperServer 8049U E1CR4T User s Manual 54 Figure 3 13 Installing the PWS Air Shroud...
Страница 60: ...SuperServer 8049U E1CR4T User s Manual 60 Figure 3 20 Left Expansion Card Housing Locking Latches...
Страница 61: ...61 Chapter 3 Maintenance and Component Installation Figure 3 21 Riser RSC R2USW 4E8 and Expansion Cards...
Страница 157: ...Appendix G BSMI Chinese Safety Warnings 157 WARNINGS 1 100V 240V 10 2 3 4 1 2 3 4 5 1 2 3 4...
Страница 158: ...158 1 2 1 2 3 4 SuperServer 8049U E1CR4T User s Manual...
Страница 160: ...160 SuperServer 8049U E1CR4T User s Manual 100 127V 60 50Hz 12 0A 200 240V 60 50Hz 9 6A...