Installation
900994-00K, 07/2021
Innovative Hearth Products
DRL2000 & DRL3500 Series Direct-Vent Gas Fireplaces
50
24. Installation/Re-installation of the required screen barrier assembly
25.
Install the Finishing Materials
1.
Complete finished interior wall.
NOTE:
To install the fireplace facing flush with the finished
wall, position framework to accommodate the thickness of the
finished wall.
NOTE:
See
Cold Climate Insulation on
Page 11
and
Vent
Termination Clearances on
Page 13
.
26.
Attach the Safety-in-Operation Warning Labels
1.
Attach the furnished safety instruction labels at all fireplace
operation and control points
(
Page 51
).
NOTE:
The installer MUST ensure these warnings are properly
attached during installation. The warning labels are a critical
means of informing consumers of safe operation practices.
Figure 43 - Combustible Wall Framing
Top Of Appliance
3”
(77 mm)
This Area Must
Remain Clear
of Combustible
Materials
1” Min.
(26 mm)
4” Clearance Minimum
Hood
Standoff Provides Space
From Combustible Materials
Stand Off Must Be Bent
To Vertical Position
Combustible Finished
Wall Materials
1.
The screen barrier assembly has four receiving slots that will hook over the four tabs on the fireplace then slide down in place (
Figure 42
).
Figure 42 - Barrier Installation - Barrier Hook View
Barrier in Place
Barrier Hook
Tab with
Slots
f i r e - p a r t s . c o m