8
www.
Supercircuits
.com
SECTION 2: GETTING STARTED: UNPACKING YOUR SYSTEM
SECTION 2
Getting Started: Unpacking Your System
2.1 Unpacking the equipment
Remove the equipment from its packaging and place it on a flat, clean surface. Inspect each item. If any visible damage is present,
contact your supplier for a replacement. Verify that your order is complete. Within your order you should find:
•
1 - ALI-QVR5016H Hybrid Digital Video Recorder (HVR). The HVR will contain the HDD option(s) you ordered.
•
1 - ALI-TS2012VR camera
•
1 - AVSI-KIT. Ensure the kit contains all the components listed above.
•
1 - ASK-4KIT-101 microphone systems
•
1 - ALI-L22W LCD monitor with the associated video and power cables, and documentation
•
1 - R59S60 cable RG59 coax with power, 60 ft
•
1 - AVSI-SPEAKER kit with power adapter
•
1 - AVSI-STEREO adapter
•
1 - AVSI-CONNECTOR
•
1 - DC12-1000R power adapters
Refer to the user manual for the product for a list of specific items included with the product. The user manual may be provided on
the CD included with the product.
NOTE
Large systems may be shipped in several cartons.
2.2 What you need
To install the AVSI-SW1 Interview Room Switch, you need:
•
5/64” hex wrench
•
#1 Phillips screwdriver
•
Small slot screwdriver
•
Screws and tools for mounting the wall plate
•
Cat5 or equivalent signal wire
Содержание avsi-10
Страница 4: ...iv www Supercircuits com NOTES ...
Страница 56: ...52 www Supercircuits com NOTES ...