OPERATION & MAINTENANCE MANUAL SWE155F
45
engine speed at low speed.
Raise boom to proper height.
Align the center line of machine track with that of
ramp and travel slowly.
When machine is over the rear wheels of the trailer,
operate on the machine slowly so that the machine
could transfer to the ramp smoothly.
When on the ramp, adjust working equipment angle so
that the angle of boom and arm is within 90-110°.
Lower the bucket to the ground until the machine
leave ramp.
2.1.7 Lifting Machine
Note
Never raise the machine with any worker on it.
Make sure the wire rope has sufficient strength
for the weight of the machine. The service
condition must be in accordance with relevant
forced standard.
Swing the working equipment to the sprocket
end, set the undercarriage and upper structure
parallel. Do not swing to the other direction.
Do not lift the machine in any posture other
than the posture given in the right fig.
When lifting, keep the machine horizontal.
Never walk under the machine.
This lifting procedure applies to machine with
standard specifications.
To get the lifting methods information for the
machines equipped with other attachments or
optional devices, please contact SUNWARD or
our distributor.
Machine lifting operation
Содержание SWE155F
Страница 20: ...OPERATION MAINTENANCE MANUAL SWE155F 13 23 Center of Gravity Label 24 Hydraulic Oil Label 25 Grease Label ...
Страница 141: ...OPERATION MAINTENANCE MANUAL SWE155F 134 4 4 10 Hoses ...
Страница 176: ...OPERATION MAINTENANCE MANUAL SWE155F 169 5 TECHNICAL SPECIFICATION ...
Страница 180: ...OPERATION MAINTENANCE MANUAL SWE155F 173 5 1 4 Electrical Schematic ...
Страница 182: ...OPERATION MAINTENANCE MANUAL SWE155F 175 5 1 6 Hydraulic Schematic ...
Страница 184: ...OPERATION MAINTENANCE MANUAL SWE155F 177 6 NOTE FOR SAFETY ...