![SUNWARD SWE155F Скачать руководство пользователя страница 108](http://html1.mh-extra.com/html/sunward/swe155f/swe155f_operation-and-maintenance-manual_1401097108.webp)
OPERATION & MAINTENANCE MANUAL SWE155F
101
3.4.7 Machine Preheating in Cold Weather
Note
When hydraulic oil temperature is below
25
℃
, operating machine in this
circumstances
can
cause
sudden
movement and stop, the machine will
become hard to maneuver. And accidents
may occur.
When the engine is difficult to be started,
it's necessary to carry out warm up
operation.
With engine started, cancel auto-idle, adjust
throttle knob to low speed position (approx.
1200r/min) to allow the engine to idle for 5
seconds.
Adjust throttle knob to set engine revs to 1500
rpm, operate bucket to perform “dig” —
“dump” blank action for 5 minutes without
attempting any other actions.
Engage engine speed at 1500 rpm, operate
bucket and arm to act to full stroke for 5
minutes.
Adjust throttle knob to speed up engine rev to
high speed position (approx. 2000r/min), cycle
the following operations for 3-5 times.
:
Boom up←→down movement
Arm retract ←→extend
bucket dig←→dump
platform left swing←→right swing
complete machine travel forward←→travel
backward
With warm-up operation done, check gas
discharging, noise and all other actions. If the
machine is functioning properly, proceed to
work. If not, keep carrying out step 4 until it’s
functioning properly.
Содержание SWE155F
Страница 20: ...OPERATION MAINTENANCE MANUAL SWE155F 13 23 Center of Gravity Label 24 Hydraulic Oil Label 25 Grease Label ...
Страница 141: ...OPERATION MAINTENANCE MANUAL SWE155F 134 4 4 10 Hoses ...
Страница 176: ...OPERATION MAINTENANCE MANUAL SWE155F 169 5 TECHNICAL SPECIFICATION ...
Страница 180: ...OPERATION MAINTENANCE MANUAL SWE155F 173 5 1 4 Electrical Schematic ...
Страница 182: ...OPERATION MAINTENANCE MANUAL SWE155F 175 5 1 6 Hydraulic Schematic ...
Страница 184: ...OPERATION MAINTENANCE MANUAL SWE155F 177 6 NOTE FOR SAFETY ...