![SUNWARD SWE155F Скачать руководство пользователя страница 115](http://html1.mh-extra.com/html/sunward/swe155f/swe155f_operation-and-maintenance-manual_1401097115.webp)
OPERATION & MAINTENANCE MANUAL SWE155F
108
3.4.13 Work
Backhoe work
The bucket should be lowered at 45
to the
ground.
Use arm as a primary digging force to pull
bucket towards machine direction.
If there is mud adhered to bucket, move arm
and (or) bucket back and forth rapidly to get
rid of mud.
Note
:
When arm is at 90
°
angle with arm
cylinder, and bucket cylinder is at 90
°
angle with rocker arm, the max digging
force of arm and bucket can be
achieved.
The range for excavating with the arm
is from a 45
away from the machine to
a 30
angle toward the machine.
Machine can execute short-time intense
excavation: a pressurizing button is
presented on the top of the left control
lever. Press it down to increase system
pressure providing intense excavation
for 8 seconds.
Ditching work
To excavate a straight ditch, set track parallel
to the ditch. Excavate to desired depth, then
travel
machine
backward
to
proceed
excavation.
Содержание SWE155F
Страница 20: ...OPERATION MAINTENANCE MANUAL SWE155F 13 23 Center of Gravity Label 24 Hydraulic Oil Label 25 Grease Label ...
Страница 141: ...OPERATION MAINTENANCE MANUAL SWE155F 134 4 4 10 Hoses ...
Страница 176: ...OPERATION MAINTENANCE MANUAL SWE155F 169 5 TECHNICAL SPECIFICATION ...
Страница 180: ...OPERATION MAINTENANCE MANUAL SWE155F 173 5 1 4 Electrical Schematic ...
Страница 182: ...OPERATION MAINTENANCE MANUAL SWE155F 175 5 1 6 Hydraulic Schematic ...
Страница 184: ...OPERATION MAINTENANCE MANUAL SWE155F 177 6 NOTE FOR SAFETY ...