2 Electrical Connection
Quick User Manual
6
2.2
Meter Connection
The Sungrow single-phase energy meter is installed next to the main switch.
Procedure:
1.
Take out the meter (with
1-phase sensor) and the
cables from the packaging.
2.
Connect the cables to the meter.
a)
Tighten the power supply wires to
terminal
3 (L)
and terminal
6 (N)
.
b)
Tighten the RS485 wires to
terminal
2
(A)
and terminal
5 (B)
.
c)
Place the 1-phase sensor around
the phase wire
(L)
from the main
switch.
The CT clamp of 1-phase sensor can be
placed before or after the main switch.
Grid
Load
L
N
c
a
b
Make sure that the 1-phase sensor is installed in the right direction: the
arrow on the sensor must point away from the grid towards the load.
Содержание SH5K
Страница 1: ...SH5K QUEN Ver14 201708 Version 1 4 Quick User Manual SH5K Grid Connected Hybrid Inverter ...
Страница 2: ......
Страница 4: ...II System Overview ...
Страница 5: ...III ...
Страница 6: ...IV ...
Страница 7: ...V ...
Страница 8: ...VI ...
Страница 9: ...VII ...
Страница 10: ...VIII ...
Страница 32: ...3 Commissioning Quick User Manual 20 Fig 3 2 Initial Settings ...