5
2
Electrical Connection
2.1
Terminal Description
Fig. 2-1
Configuration Circuit Board Inside the Inverter
No.
Label
Connection
Tool Requirements
1
C1, C2
Backup box STB5K
Flat-head screwdriver
with an open end of 3 mm
2
Copper
PV (Parallel mode)
Phillips screwdriver
3 Ethernet
Communication
-
4 DRM
Demand response enabling
device (DRED)
Flat-head screwdriver
with an open end of 2 mm
5
DI
Backup box STB5K
6 RS485
A1, B1 for the battery,
A2, B2 for the meter
7 120
ohM
RS485
-
8
BAT_Temp.
Temperature sensor PT1000
Flat-head screwdriver
with an open end of 3 mm
9
BAT_Com.
(CANH, CANL)
Battery communication
10 DO1
Power
management
11 DO2
Earth
fault
alarm
12
BAT+, BAT-
Battery
Phillips screwdriver
Содержание SH5K
Страница 1: ...SH5K QUEN Ver14 201708 Version 1 4 Quick User Manual SH5K Grid Connected Hybrid Inverter ...
Страница 2: ......
Страница 4: ...II System Overview ...
Страница 5: ...III ...
Страница 6: ...IV ...
Страница 7: ...V ...
Страница 8: ...VI ...
Страница 9: ...VII ...
Страница 10: ...VIII ...
Страница 32: ...3 Commissioning Quick User Manual 20 Fig 3 2 Initial Settings ...