2 Electrical Connection
13
2.7
STB5K Connection (Off-grid)
The backup box is installed between the SUNGROW meter and the hybrid inverter.
For the installation and the cable connection of STB5K, see the Quick
Installation Guide delivered with the STB5K module.
Sungrow meter
Home appliance
PV system
STB5K
Emergency appliance
SH5K
A
Meter
link
Network
meter
Main
switch
Utility
grid
Battery
Connecting the Power Cables
Risk of inverter damage due to incorrect cable connection. Do not connect
the grid power wires to LOAD terminals.
A residual current device (RCD) should be required on the LOAD port of the
backup box STB5K.
Cross-section: 4 mm
²
, cable diameter: 10 mm–14 mm
Connect terminals L1, N1 and PE to the grid, and connect terminals L4, N4 and PE to
the AC terminals on SH5K.
Содержание SH5K
Страница 1: ...SH5K QUEN Ver14 201708 Version 1 4 Quick User Manual SH5K Grid Connected Hybrid Inverter ...
Страница 2: ......
Страница 4: ...II System Overview ...
Страница 5: ...III ...
Страница 6: ...IV ...
Страница 7: ...V ...
Страница 8: ...VI ...
Страница 9: ...VII ...
Страница 10: ...VIII ...
Страница 32: ...3 Commissioning Quick User Manual 20 Fig 3 2 Initial Settings ...