86
ffiig
gu
urre
e 8
8--2
25
5 DO Operation in Timing Mode
S
Sw
wiittc
ch
h M
Mo
od
de
e
In this mode, the system will control the load operation according to the setting. In the
following example, the switch is set to OFF.
ffiig
gu
urre
e 8
8--2
26
6 DO Operation in Switch Mode
IIn
ntte
elllliig
ge
en
ntt M
Mo
od
de
e
The system will control the load operation according to the power optimization algorithm
of energy management.
During the setting interval, the DO function will be enabled to power on the load if the ex-
cess PV energy exceeds the optimized power value.
Notice:
The intelligent mode is disabled in an off-grid system.
•
When the inverter is installed to retrofit an exisiting PV system, the upper limit of opti-
mized power is the sum of the rated power of the hybrid inverter and the rated power
of the existing PV inverter.
•
Once the intelligent mode is enabled, the DO relay will remain connected for 20 mi-
nutes after the DO connection.
Take 09:00 am–09:30 am and the optimized power of 1000 W as an example.
User Manual