64
step 4
Initialize parameters according to local grid requirements, including grid type, reactive
power regulation mode, etc. The screen displays that the inverter is successfully
configured.
ffiig
gu
urre
e 7
7--1
10
0 Initializing Parameters
-- -- E
En
nd
d
7.6
Configuring the Plant
The inverter is successfully added to the plant and initialized. Refer to the guidance in
previous sections.
The distributor/installer who creates a plant for the end user needs to get the end user's
e-mail address. In configuring a plant, the e-mail address is required, and each e-mail
address can be registered only once.
step 1
The App screen will display the added inverter. Tap N
NE
EX
XT
T to configure the plant.
ffiig
gu
urre
e 7
7--1
11
1 Display the Added Inverter
step 2
Fill in the plant information. The fields marked with * must be filled in.
User Manual