89
ffiig
gu
urre
e 8
8--2
29
9 Grounding Detection
If the grounding detection is enabled, the DO relay will switch on automatically to signal
the external alarm if the value exceeds the grounding detection alarm value. The buzzer
inside the inverter will beep.
The PV insulation resistance fault (fault sub-code 039) will trigger the DO relay to signal
the external alarm.
8.10.14 Parallel Configuration
When two or more inverters are connected in parallel, the inverter needs to be set as the
master or slave.
Tap M
Mo
orre
e→
→S
Se
ettttiin
ng
gss→
→P
Po
ow
we
err R
Re
eg
gu
ulla
attiio
on
n P
Pa
arra
am
me
ette
errss→
→F
Fe
ee
ed
d--iin
n L
Liim
miitta
attiio
on
n to enter
the corresponding screen.
P
Pa
arra
am
me
ette
err
D
De
effa
au
ulltt vva
allu
ue
e
R
Ra
an
ng
ge
e
M
Ma
asstte
err--sslla
avve
e o
op
pe
erra
attiio
on
n
m
mo
od
de
e
ON
ON / OFF
M
Ma
asstte
err--sslla
avve
e sse
ettttiin
ng
g
Master
Master / Slave 1 / Slave 2 / Slave
3 / Slave 4
T
To
otta
all N
Nu
um
mb
be
err o
off M
Ma
asstte
err
a
an
nd
d S
Slla
avve
ess
2
2 ~ 5
8.10.15 Frequency Shift Power Control
Tap M
Mo
orre
e→
→S
Se
ettttiin
ng
gss→
→O
Op
pe
erra
attiio
on
n P
Pa
arra
am
me
ette
errss→
→O
Otth
he
err P
Pa
arra
am
me
ette
errss to enter the corre-
sponding screen.
User Manual