33
Item
Quantity
Specification
Source
Grub screw
2
M4×10
Delivery scope
Bolt assembly
4
M10
Delivery scope
Nut assembly
4
M10
Self-prepared
U-shaped steel
2
—
Self-prepared
Clamp
2
Determined by column
specifications
Self-prepared
step 1 Bury the column into the installation site.
Please skip this step if you need to install the inverter on a concrete post, PV
bracket, etc. by holding the post.
step 2 Assemble the mounting-bracket by using the connecting bar.
step 3 Mark and punch holes in the U-beam according to the dimensions shown below.
step 4 Use bolts and clamps to fix the U-beam to the column.