VI
4.5.1 Bracket-Mounted Installation................................................................27
.....................................................................................36
5.5 External Protective Grounding Connection .....................................................43
5.5.1 External Protective Grounding Requirements ........................................43
5.6.2 Requirements for OT/DT Terminal ........................................................47
5.6.3 Connection Procedure of One Wire per Phase with Multi-core
Cable ............................................................................................48
5.6.4 Connection Procedure of Two Wires per Phase with Multi-core
Cable ............................................................................................52
5.7.2 Assembling the PV Connectors ............................................................59
5.8 Wiring of Tracking System Power Cable (Optional) .........................................62
5.9.2 RS485 Communication System............................................................64
...............................................................................................75
Содержание SG285HX
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 44: ...34 step 5 Use bolts to secure the pegboard to the U beam End 4 Mechanical Mounting User Manual...
Страница 128: ...www sungrowpower com Sungrow Power Supply Co Ltd...