21
The AC cable is vertically led into the AC terminal, and the straight length is higher
than 200 mm.
In case of multiple inverters, reserve specific clearance between the inverters.
Back-to-Back Installation
When installing inverters back-to-back, the distance between every two inverters should be
at least 600 mm (recommended).
If the on-site distance is shorter than the recommended clearance, add a baffle between
every two inverters to form a heat dissipation channel (not recommended). The baffle plate
should be placed horizontally between two inverters and should not block the air inlet and
outlet of inverters.