63
step 4 Stack the OT terminals on the OT/DT terminal of the AC cables, and fix the cables to corre-
sponding terminals.
The tracking power cable can be installed in any two phases of L1/L2/L3.
step 5 Close the protection cover. Close the wiring compartment and tighten the two screws on its
front cover with supplied Allen wrench.
- - End
User Manual
Содержание SG285HX
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 44: ...34 step 5 Use bolts to secure the pegboard to the U beam End 4 Mechanical Mounting User Manual...
Страница 128: ...www sungrowpower com Sungrow Power Supply Co Ltd...