Commissioning
Commissioning is a critical procedure for a PV system, which can protect the
system from fires, and personnel from injury and electrical shock.
7.1
Inspection before Commissioning
Before starting the inverter, you should check the following items.
1.
The inverter should be accessible for operation, maintenance and
service.
2.
Check again to confirm that the inverter is firmly installed.
3.
Proper ventilation.
4.
The inverter is clean and free of debris.
5.
The inverter and accessories are correctly connected.
6.
Cables are routed safely place and protected against mechanical
damage.
7.
The specification of the AC circuit breaker is appropriate for its intended
use.
8.
The terminals not used underneath the inverter should be sealed.
9.
Warning signs & labels are suitably affixed and durable.
7.2
Commissioning Procedure
If all of the items mentioned above meet the requirements, proceed as follows
to start up the inverter for the first time.
Step 1
Make sure all the above-mentioned items meet the requirements.
Step 2
Close the external AC circuit breaker.
Step 3
Rotate the DC switch to the “ON” position.
Step 4
Use the SunAccess App to establish the communication connection with
the inverter through Bluetooth to set the initial parameters. When the
Содержание SG125HV
Страница 1: ...SG125HV V1 UEN Ver10 201809 Version 1 0 User Manual SG125HV SG125HV 20 PV Grid connected Inverter...
Страница 2: ......
Страница 11: ...IX 11 4 Contact Information 109...
Страница 12: ......
Страница 24: ...1 Safety Instructions User Manual 12 service d utilisateur avant l utilisation...