User Manual
46
It is not allowed to connect loads between inverter and circuit breaker.
Multiple Inverters in parallel Connection
If multiple inverters are connected to the LV side of the MV transformer in
parallel, and the HV side is connected to the MV grid, please respect following
requirement:
When more than 25 inverters are connected to a single winding of the
transformer, please contact Sungrow to confirm the technical solution.
L3
L2
L1
L3
L2
L1
LV side
HV side
MV transformer
Inverter 1
Inverter 2
Inverter n
Fig. 6-2
Multiple Inverters in parallel Connection
Medium-voltage Transformers
SG125HV/SG125HV-20 Transformer Technical Requirements
Nominal Frequency: 50Hz/60Hz
Primary Voltage: According to the grid-connection point voltage
Secondary Voltage: 600Vac
(
Line to Line, allowed range:480~690Vac
)
SG125HV/
SG125HV-20
MV Grid
MV Transformer
1#
2#
N#
Note
: Additional phase monitoring devices may be required for grounded
primary (utility side) transformers. Engineers should confirm the protection
requirement prior to selecting the transformer.
Содержание SG125HV
Страница 1: ...SG125HV V1 UEN Ver10 201809 Version 1 0 User Manual SG125HV SG125HV 20 PV Grid connected Inverter...
Страница 2: ......
Страница 11: ...IX 11 4 Contact Information 109...
Страница 12: ......
Страница 24: ...1 Safety Instructions User Manual 12 service d utilisateur avant l utilisation...