User Manual
25
Tab. 3-1
Description of installation flow
Procedure Description
Reference
1
Select optimal installation site
5.1
2
Move the inverter to the installation site
5.2
3
Unpacking and inspection
4.1
4
Read the User Manual, especially the section on
“Safety Instruction”
1
5
Install the inverter to the selected installation site
5.3
6
Electrical connection;
DC side connection;
AC side connection;
Ground connection;
Communication connection.
6.3~6.7
7
Inspection before commissioning
7.1
8
Start up the inverter and configure corresponding
parameters.
7.2
9
Troubleshooting
9.1