iv
Sun Fire T2000 Server Installation Guide
• April 2006
▼
To Install the Cable Management Kit
▼
To Verify the Operation of the Slide Rails and the CMA
23
26
Connecting Cables to the Server
▼
To Connect the Ethernet Network Cables
▼
To Connect the SC Serial Management Port
▼
To Connect the SC Network Management Port
29
30
▼
To Open and Close a Cable Clip
▼
32
3.
Powering On the System for the First Time
Enabling the System Controller Network Management Port
38
Logging Into the System Controller
▼
To Log Into the System Controller Using the Serial Management Port
▼
To Configure the System Controller Network Management Port
▼
To Reset the System Controller
▼
To Log Into the System Controller Using the Network Management Port
43
Using the System Controller for Common Operations
▼
▼
To Connect to the System Console
45
▼
To Perform a Normal System Initialization
Содержание Sun Fire T200
Страница 6: ...vi Sun Fire T2000 Server Installation Guide April 2006...
Страница 10: ...x Sun Fire T2000 Server Installation Guide April 2006...
Страница 14: ...xiv Sun Fire T2000 Server Installation Guide April 2006...
Страница 16: ...xvi Sun Fire T2000 Server Installation Guide April 2006...
Страница 29: ...Chapter 1 Preparing for Installation 9 FIGURE 1 5 Locating the Locks on the Slide Rail Assembly...
Страница 54: ...34 Sun Fire T2000 Server Installation Guide April 2006...
Страница 70: ...50 Sun Fire T2000 Server Installation Guide April 2006...
Страница 80: ...60 Sun Fire T2000 Server Installation Guide April 2006...