35
C H A P T E R
3
Powering On the System
This chapter includes instructions for booting the Sun Fire T2000 system and for
enabling the system controller network management port.
The following topics are discussed:
■
“Powering On the System for the First Time” on page 35
■
“Enabling the System Controller Network Management Port” on page 38
■
“Logging Into the System Controller” on page 38
■
“Using the System Controller for Common Operations” on page 44
■
“Booting the Solaris Operating System” on page 47
Powering On the System for the First
Time
Tip –
The serial terminal or a terminal emulator should be connected before you
connect the power cables, or you will not see the system messages. The server goes
into standby mode and the ALOM-CMT system controller initializes as soon as the
AC power cables are connected to the power source.
Note –
If you are not logged in, ALOM-CMT times out after 60 seconds and reverts
to the system console. For more information, refer to the
Sun Fire T2000 Server
Advanced Lights Out Management (ALOM) Guide
.
The system controller runs on the 3.3v standby voltage. As soon as AC power is
connected to the system, the system controller powers on, runs diagnostics, and
initializes the ALOM-CMT firmware.
Содержание Sun Fire T200
Страница 6: ...vi Sun Fire T2000 Server Installation Guide April 2006...
Страница 10: ...x Sun Fire T2000 Server Installation Guide April 2006...
Страница 14: ...xiv Sun Fire T2000 Server Installation Guide April 2006...
Страница 16: ...xvi Sun Fire T2000 Server Installation Guide April 2006...
Страница 29: ...Chapter 1 Preparing for Installation 9 FIGURE 1 5 Locating the Locks on the Slide Rail Assembly...
Страница 54: ...34 Sun Fire T2000 Server Installation Guide April 2006...
Страница 70: ...50 Sun Fire T2000 Server Installation Guide April 2006...
Страница 80: ...60 Sun Fire T2000 Server Installation Guide April 2006...