2-2
Netra CT 820 Server Service Manual
• July
2004
addition, you should go through a hardware power-on only if you powered down
the server using the hardware power-off instructions (see
).
■
Software power-on—This powers on node or switching fabric slots on a slot-by-
slot basis through the distributed management card. You can go through a slot-
by-slot software power-on only if you powered down the individual slots using
the software power-off instructions (see
“Performing a Software Power-Off” on
); you cannot go through a slot-by-slot software power-on if you powered
off the entire system using the hardware power-off instructions.
2.1.1
Performing a Hardware Power-On
1. At the rear of the Netra CT 820 server, verify that you have made the proper
connections to the DC power input panel (
).
FIGURE
2-1
DC Power Input Panel
GND
-48VDC
A
B
RTN
GND
-48VDC
A
B
RTN
“A” terminals: -48V Return
“B” terminals: -48V Return Chassis ground
Power switch
Chassis ground
Содержание Netra CT 820
Страница 7: ...Contents vii Index Index 1...
Страница 8: ...viii Netra CT 820 Server Service Manual July 2004...
Страница 18: ...xviii Netra CT 820 Server Service Manual July 2004...
Страница 22: ...1 4 Netra CT 820 Server Service Manual July 2004...
Страница 28: ...2 6 Netra CT 820 Server Service Manual July 2004...
Страница 46: ...4 16 Netra CT 820 Server Service Manual July 2004...
Страница 72: ...6 8 Netra CT 820 Server Service Manual July 2004...
Страница 80: ...7 8 Netra CT 820 Server Service Manual July 2004...
Страница 84: ...8 4 Netra CT 820 Server Service Manual July 2004...
Страница 118: ...A 34 Netra CT 820 Server Service Manual July 2004...
Страница 128: ...Glossary 4 Netra CT 820 Server Service Manual July 2004...
Страница 132: ...Index 4 Netra CT 820 Server Service Manual July 2004...