background image

x

    Netra CT 820 Server Service Manual

 

• July 

2004 

 

FIGURE

 

7-1

Distributed Management Card Rear Transition Card Ports

 

7–2

FIGURE

 

7-2

Midplane Assembly Retention Screw Locations

 

7–5

FIGURE

 

7-3

Installing the Midplane Assembly

 

7–6

FIGURE

 

8-1

Netra CT 820 Server Components (Front)

 

8–2

FIGURE

 

8-2

Netra CT 820 Server Components (Rear)

 

8–3

FIGURE

 

A-1

Distributed Management Card Port

 

A–2

FIGURE

 

A-2

RJ-45 Console Connector Diagram

 

A–3

FIGURE

 

A-3

Distributed Management Card Rear Transition Module Ports

 

A–4

FIGURE

 

A-4

Console Port Connector Pins

 

A–5

FIGURE

 

A-5

Alarm Port

 

A–6

FIGURE

 

A-6

RJ-45 Ethernet Connector Diagram

 

A–7

FIGURE

 

A-7

Switching Fabric Board Ports

 

A–8

FIGURE

 

A-8

RJ-11 Console Connector Diagram

 

A–9

FIGURE

 

A-9

Out-of-Band Ethernet Management Port

 

A–10

FIGURE

 

A-10

Ports on the Rear Transition Module for the Switching Fabric Board

 

A–11

FIGURE

 

A-11

RJ-45 Ethernet Connector Diagram

 

A–12

FIGURE

 

A-12

RJ-45 Ethernet Connector Diagram

 

A–13

FIGURE

 

A-13

RJ-11 Console Connector Diagram

 

A–14

FIGURE

 

A-14

Netra CP2300 Board

 

A–15

FIGURE

 

A-15

Front Panel Serial Port (TTYA) Diagram

 

A–16

FIGURE

 

A-16

Netra CP2300 Board PMC Port Connectors

 

A–17

FIGURE

 

A-17

Rear Transition Module for the Netra CP2300 Transition Card Connectors

 

A–24

FIGURE

 

A-18

PIM Connector Pins

 

A–25

FIGURE

 

A-19

USB Connector Port A Pins

 

A–31

FIGURE

 

A-20

Serial Port Connector Pins

 

A–31

FIGURE

 

A-21

Fast Ethernet Connector Pins

 

A–32

FIGURE

 

C-1

DC Input Specifications

 

C–1

Содержание Netra CT 820

Страница 1: ...Sun Microsystems Inc www sun com Submit comments about this document at http www sun com hwdocs feedback Netra CT 820 Server Service Manual Part No 817 2642 11 July 2004 Revision A...

Страница 2: ...opyright 2004 Sun Microsystems Inc 4150 Network Circle Santa Clara Californie 95054 Etats Unis Tous droits r serv s Sun Microsystems Inc a les droits de propri t intellectuels relatants la technologie...

Страница 3: ...or Boards 2 1 2 1 1 Performing a Hardware Power On 2 2 2 1 2 Performing a Software Power On 2 3 2 2 Powering Off the Server 2 3 2 2 1 Performing a Hardware Power Off 2 4 2 2 2 Performing a Software P...

Страница 4: ...mmand Line Interface 4 6 4 2 2 Running the Diagnostics Tests through SunVTS 4 10 5 Removing and Replacing Hot Swappable Cards 5 1 5 1 Removing and Installing Distributed Management Cards 5 2 5 1 1 Rul...

Страница 5: ...stributed Management Card 7 1 7 1 1 Removing a Rear Transition Card for the Distributed Management Card 7 1 7 1 2 Installing the Rear Transition Card for the Distributed Management Card 7 3 7 2 Removi...

Страница 6: ...300 Board Pinouts A 15 A 5 1 Serial Connector A 16 A 5 2 PMC Connectors A 17 A 5 3 PMC A Connector Interfaces A 18 A 5 4 PMC B Connector Interfaces A 20 A 6 Rear Transition Module for the Netra CP2300...

Страница 7: ...Contents vii Index Index 1...

Страница 8: ...viii Netra CT 820 Server Service Manual July 2004...

Страница 9: ...he DMC Standby dmcstest Test Parameter Options Dialog Box 4 15 FIGURE 5 1 Injector Ejector Operation for Board Level Components 5 2 FIGURE 5 2 Distributed Management Card Ports 5 4 FIGURE 5 3 Location...

Страница 10: ...RE A 7 Switching Fabric Board Ports A 8 FIGURE A 8 RJ 11 Console Connector Diagram A 9 FIGURE A 9 Out of Band Ethernet Management Port A 10 FIGURE A 10 Ports on the Rear Transition Module for the Swit...

Страница 11: ...A 7 TABLE A 6 RJ11 CONSOLE Port Pinout A 9 TABLE A 7 Ethernet Management Port Pinout A 10 TABLE A 8 10 100Mb Switched Ethernet Port Pinout A 12 TABLE A 9 1000Mb Switched Ethernet Port Pinout A 13 TABL...

Страница 12: ...Connector J6 A 28 TABLE A 21 PIM B Connector J7 A 29 TABLE A 22 Universal Serial Bus Port A A 31 TABLE A 23 Serial Port A A 32 TABLE A 24 Serial Port B A 32 TABLE B 1 Connecting an ASCII Terminal B 2...

Страница 13: ...ting System OS You should be comfortable with LAN fundamentals and with networking in general Before performing the procedures described in this book you should have completed the installation and set...

Страница 14: ...removing and replacing hot swappable subassemblies Chapter 7 gives instructions for removing and replacing cold replaceable subassemblies Chapter 8 gives the illustrated parts breakdown for the Netra...

Страница 15: ...Cc123 The names of commands files and directories on screen computer output Edit your login file Use ls a to list all files You have mail AaBbCc123 What you type when contrasted with on screen compute...

Страница 16: ...tes mentioned in this document Sun does not endorse and is not responsible or liable for any content advertising products or other materials that are available on or through such sites or resources Su...

Страница 17: ...n com service contacting Sun Welcomes Your Comments Sun is interested in improving its documentation and welcomes your comments and suggestions You can submit your comments by going to http www sun co...

Страница 18: ...xviii Netra CT 820 Server Service Manual July 2004...

Страница 19: ...820 server This chapter is divided into the following sections Section 1 1 Tools Required on page 1 1 Section 1 2 Attaching the Antistatic Wrist Strap on page 1 2 1 1 Tools Required You need the foll...

Страница 20: ...components from static shock when handling them wear a wrist strap plugged into the most convenient ESD jack 1 Place an electrostatic discharge mat close to the system 2 Connect the wrist strap to th...

Страница 21: ...Chapter 1 Preparing for FRU Installation and Replacement 1 3 FIGURE 1 2 Location of ESD Ground Jack on Netra CT 820 Server Rear ESD ground jack Power switch...

Страница 22: ...1 4 Netra CT 820 Server Service Manual July 2004...

Страница 23: ...tems on a network by synchronizing the clocks of all the systems A Solaris server called xntp sets and maintains the timestamp Refer to the Netra CT 820 Server System Administration Guide 817 2647 and...

Страница 24: ...wer on only if you powered down the individual slots using the software power off instructions see Performing a Software Power Off on page 2 4 you cannot go through a slot by slot software power on if...

Страница 25: ...n the Netra CT 820 server using the distributed management card software For example to power on the node card in slot 11 in your Netra CT 820 server enter the following command Refer to the Netra CT...

Страница 26: ...power switch turns off the output of the power supplies To completely disconnect power to the system you must remove the input feed power going to the DC terminals at the rear of the server 3 If you w...

Страница 27: ...using the distributed management card software For example to power off the node card in slot 11 in your Netra CT 820 server enter the following command Refer to the Netra CT 820 Server System Admini...

Страница 28: ...2 6 Netra CT 820 Server Service Manual July 2004...

Страница 29: ...PSB cards Caution The system is sensitive to static electricity To prevent damage to the assembly always connect an antistatic wrist strap between you and the system Caution Do not flex the cPSB cards...

Страница 30: ...se or broken obtain a replacement card Caution The heat sinks on a card can be damaged by improper packaging When storing or shipping a card ensure that the heat sinks have sufficient protection Cauti...

Страница 31: ...distributed management card Some tests are available for both the active 1A DMC and the standby 1B DMC while others are available only for the active DMC Following are detailed descriptions of the DM...

Страница 32: ...loopback test It loops internally through the Phy component of the Ethernet device and sends back the packet The Ping test uses the IP address provided by the user It sends packets to the designated h...

Страница 33: ...from the RTC 4 1 7 Fan Status Test The Fan Status test checks the status of the three fan trays and the three fans within each fan tray and reports if the fans are present and if the fans are operati...

Страница 34: ...ndby DMC card runs the test on only the standby DMC card 4 1 10 1 Midplane FRU Devices There are two midplane FRU devices The IPMI type FRU which has five segments the Header Area the Internal Info Ar...

Страница 35: ...rns a pass status when any of the midplane or fan sensor temperatures rise from inlet to outlet at 55 C ambient A midplane or fan sensor will return a warning status if it reaches 75 C 20 C over the 5...

Страница 36: ...e information on accessing the DMC command line interface To display the version number of the dmcdiag utility enter the following command or To display a list of options for the dmcdiag utility for t...

Страница 37: ...ealth E D ipmi E D rtc E D fruidchksum E D TABLE 4 1 Options for the dmcdiag Utility for the Active DMC Supported on DMC Options Variables Additional Information Active and standby enet E Enable Ether...

Страница 38: ...est on page 4 2 for more information Off Toggle Active and standby a3on On Alarm 3 On test Enter either On or Off or Toggle Refer to Alarm Port Test on page 4 2 for more information Off Toggle Active...

Страница 39: ...temperature test Enter either Enable or Disable Refer to I2C Temperature Test on page 4 5 for more information D Disable Active only psupplystatus E Enable Power supply status test Enter either Enabl...

Страница 40: ...through SunVTS the IPMI test which checks the IPMI connectivity between the Netra CP2300 boards and the active 1A DMC the dmcatest test which tests the components on the active 1A DMC the dmcstest te...

Страница 41: ...cs SunVTS Test The dmcatest is a Solaris level DMC diagnostics test that runs on SunVTS through the Netra CP2300 board You must establish the communication interface between the active 1A DMC and the...

Страница 42: ...4 12 Netra CT 820 Server Service Manual July 2004 FIGURE 4 3 Top Half of the DMC Active dmcatest Test Parameter Options Dialog Box...

Страница 43: ...ptions Dialog Box The options and variables for the dmcatest are the same as the dmcdiag utility for the active 1A DMC that is run through the DMC command line interface Refer to TABLE 4 1 for an expl...

Страница 44: ...CP2300 board before running this test To test the standby 1B DMC select the DMC Standby dmcstest option from the main SunVTS window FIGURE 4 1 The DMC Standby dmcstest Test Parameter Options dialog bo...

Страница 45: ...ptions Dialog Box The options and variables for the dmcstest are the same as the dmcdiag utility for the standby 1B DMC that is run through the DMC command line interface Refer to TABLE 4 1 for an exp...

Страница 46: ...4 16 Netra CT 820 Server Service Manual July 2004...

Страница 47: ...SD ground jacks when removing and replacing hot swappable cards This chapter gives removal and replacement instructions for the following hot swappable cards in a Netra CT 820 server Section 5 1 Remov...

Страница 48: ...trictions for hot swapping the distributed management cards If you are hot swapping a distributed management card you cannot hot swap any other component in the Netra CT 820 server while the card is r...

Страница 49: ...y slot in the system through BD_SEL if both of the system s DMCs are removed simultaneously all the boards in the system lose power When removing a DMC from a powered system the card performs a contro...

Страница 50: ...ot swap LED is off follow these instructions to put the DMC into a safe state a Partially unlatch the card s ejector Do not fully open the ejector as this moves the board out of the enclosure and brea...

Страница 51: ...Prepare the distributed management card by opening its injector ejector handle FIGURE 5 1 3 Carefully align the edges of the board with the card guides in the distributed management card slot Look in...

Страница 52: ...le only as a rear access server Every server is shipped with two switching fabric boards installed in slots 2 and 21 in the front of the server and two rear transition cards for the switching fabric b...

Страница 53: ...g Fabric Board 1 Disengage the ejector to notify software that the board is about to be removed and wait for the hot swap LED to light Refer to FIGURE 5 3 for the location of the hot swap LED on the s...

Страница 54: ...5 10 Note As long as the switching fabric board is removed from the slot and the system is running with only the single remaining switching fabric board you will not have redundancy for that component...

Страница 55: ...e 6 Install a replacement rear transition card or a filler panel to maintain the enclosure s shielding and cooling performance Refer to Section 5 2 2 1 Installing the Rear Transition Card for a Switch...

Страница 56: ...by opening its injector ejector handles 4 Carefully align the edges of the board with the card guides in the slot Look into the enclosure to verify correct alignment of the rails in the guides 5 Keepi...

Страница 57: ...er Examples in this section might refer to the Netra CP2300 board for all other node boards refer to the documentation that came with your board Slots 3 through 20 in the Netra CT 820 server support P...

Страница 58: ...ed or handled Do not disassemble or recharge the battery Do not dispose of the battery in fire When the battery is replaced the same type or an equivalent type recommended by the manufacturer must be...

Страница 59: ...utward until the board disengages from the midplane FIGURE 5 1 4 Slide the board evenly out of the enclosure 5 Determine if you are going to replace the rear transition card or not If you are going to...

Страница 60: ...ave first removed the node board 2 Disconnect any cables connected to the rear transition card for the node board FIGURE 5 6 shows the ports on the rear transition card for the Netra CP2300 board for...

Страница 61: ...of power supplies 5 3 2 Installing a Node Board Set If you want to install the rear transition card go to Section 5 3 2 1 Installing the Rear Transition Card for a Node Board on page 5 15 If you want...

Страница 62: ...nals routed through the Netra CP2300 board rear transition card or through the switching fabric board rear transition cards RTCs Position 0 of the SW503 DIP switch on the Netra CP2300 board controls t...

Страница 63: ...n slots 3 20 in the Netra CT 820 server 3 Remove the filler panel if necessary 4 Prepare the node board by opening its injector ejector handles FIGURE 5 1 5 Carefully align the edges of the board with...

Страница 64: ...ejector handles to their closed positions rotate inward to seat the midplane connectors If system power is on the node board hot swap LED lights green It can take several seconds for the LED to chang...

Страница 65: ...and hot swappable and plug directly into the power trays FIGURE 6 1 The number of power supplies needed in any given system depends on the load in that system Every Netra CT 820 server is shipped out...

Страница 66: ...oving the Air Filter on page 6 6 for those instructions 2 Unscrew the two retention screws on the front of the power supply you wish to remove See FIGURE 6 1 for the location of power supply retention...

Страница 67: ...f the enclosure 5 Install a replacement power supply to maintain the enclosure s shielding and cooling performance Go to Section 6 1 2 Installing a Power Supply on page 6 3 6 1 2 Installing a Power Su...

Страница 68: ...oving and Installing Fan Trays Nine blowers housed in three removable fan trays occupy the top of the enclosure Each fan tray is secured by a captive screw and plugs into a blind mating receptacle in...

Страница 69: ...required to install a fan tray 1 Select an empty fan bay at the top of the enclosure 2 Align the fan tray with the guides in the bay Orient the fan tray with the handle at the bottom 3 Slide the fan t...

Страница 70: ...nt in the filter is replaceable 6 3 1 Removing the Air Filter 1 Unscrew the two retention screws at the top of the air intake grill FIGURE 6 4 FIGURE 6 4 Intake Grill and Air Filter 2 Pull the grill a...

Страница 71: ...it a new filter element into the back of the grill and clip the filter retainer into place 2 Insert the intake grill tabs into the bottom into the enclosure 3 Align the screws at the top of the grill...

Страница 72: ...6 8 Netra CT 820 Server Service Manual July 2004...

Страница 73: ...ion Card for the Distributed Management Card The rear transition card for the distributed management card is not a hot swappable component you must fully power off the system before removing the rear...

Страница 74: ...ent card FIGURE 7 1 Distributed Management Card Rear Transition Card Ports 3 Unscrew the board retention screws that fasten the board to the enclosure Service LAN Ethernet port Alarm port Console port...

Страница 75: ...e the rear transition card by opening its injector ejector handles 3 Carefully align the edges of the card with the card guides in the slot Look into the enclosure to verify correct alignment of the r...

Страница 76: ...gement Card on page 5 3 See Section 5 2 1 Removing a Switching Fabric Board Set on page 5 7 See Section 5 3 1 Removing a Node Board Set on page 5 12 See Section 6 2 1 Removing a Fan Tray on page 6 4 3...

Страница 77: ...Chapter 7 Removing and Replacing Cold Swappable Subassemblies 7 5 FIGURE 7 2 Midplane Assembly Retention Screw Locations 5 Pull forward on the cage until it disengages from the system...

Страница 78: ...mbly 3 Slide the cage into the system until the midplane connectors engage 4 Replace the four midplane assembly retention screws on the front of the enclosure FIGURE 7 2 5 Replace the two upper center...

Страница 79: ...Chapter 7 Removing and Replacing Cold Swappable Subassemblies 7 7 7 Reconnect the system to power and turn it on Refer to Section 2 1 Powering On the Server or Boards on page 2 1...

Страница 80: ...7 8 Netra CT 820 Server Service Manual July 2004...

Страница 81: ...s the FRUs located at the front of the system TABLE 8 1 FRUs Located at the Front of the System FRU Part Number 1 Fan trays F370 6046 2 Netra CP2300 boards F375 3121 3 PMC hard disk drive F375 3163 X7...

Страница 82: ...8 2 Netra CT 820 Server Service Manual July 2004 FIGURE 8 1 Netra CT 820 Server Components Front 01 1 2 3 01 1 2 3 01 1 2 3 01 1 2 3 01 1 2 3 01 1 2 3 1 7 2 4 5 6 3...

Страница 83: ...820 Server Components Rear TABLE 8 2 FRUs Located at the Rear of the System FRU Part Number 1 Rear transition card Netra CP2300 board F375 3134 XCP2300 TRN 2 Rear transition card distributed manageme...

Страница 84: ...8 4 Netra CT 820 Server Service Manual July 2004...

Страница 85: ...s on page A 2 Section A 2 Rear Transition Module for the Distributed Management Card Pinouts on page A 4 Section A 3 Switching Fabric Board on page A 8 Section A 4 Rear Transition Module for the Switc...

Страница 86: ...A 2 Netra CT 820 Server Service Manual July 2004 A 1 Distributed Management Card Pinouts FIGURE A 1 Distributed Management Card Port Console port...

Страница 87: ...Pinouts The console port on the distributed management card use a standard RJ 45 connector FIGURE A 2 RJ 45 Console Connector Diagram TABLE A 1 Console Port Pinouts Pin No Signal Pin No Signal 1 RTS 5...

Страница 88: ...buted Management Card Rear Transition Module Ports Service LAN Ethernet port Alarm port Console port Distributed management card 1A Distributed management card 1A Distributed management card 1A Servic...

Страница 89: ...nd 1B on the rear transition module for the distributed management card use standard DB 9 connectors FIGURE A 4 Console Port Connector Pins The signal interface of the connectors are described in the...

Страница 90: ...stributed management card use standard male DB 15 connectors FIGURE A 5 Alarm Port TABLE A 4 Alarm Ports 1A and 1B Pinouts Pin No Signal Pin No Signal Pin No Signal 1 RESET0 6 ALARM0_NC 11 ALARM2_NO 2...

Страница 91: ...rnet interface on the distributed management card and the external Ethernet interface on the switching fabric board must be connected to different subnets If they are configured on the same subnet arp...

Страница 92: ...rts Following are the pinouts for each of the ports on the switching fabric board Console Port on page A 9 Management Port on page A 10 SYSTEM FAULT MGMT PORT 1 3 5 7 9 11 13 15 17 19 21 23 25 MGMT MD...

Страница 93: ...ship kit FIGURE A 8 RJ 11 Console Connector Diagram Only the signals transmit receive and ground are used The pinouts for this port are shown in TABLE A 6 Note DTE DB 9 also provides loopback of DTR...

Страница 94: ...agement port on the switching fabric board uses an RJ 45 connector FIGURE A 9 Out of Band Ethernet Management Port The pinout for the Out of Band Ethernet Management port MDI is shown in TABLE A 7 TAB...

Страница 95: ...Module for the Switching Fabric Board Note Port 24 on the rear transition card for the switching fabric board is reserved for future use CONSOLE 1000M 26X 1000M 25X 10 100M 24X 10 100M 23X 10 100M 22X...

Страница 96: ...e pinouts for each of the ports on the switching fabric board 10 100 Mbps Ethernet Ports 20 23 Pinouts on page A 12 1000 Mbps Ethernet Ports 25 and 26 on page A 13 Console Port on page A 14 A 4 1 10 1...

Страница 97: ...rear transition module for the switching fabric board use standard RJ 45 connectors They are both 1000 Mbps Ethernet ports FIGURE A 12 RJ 45 Ethernet Connector Diagram TABLE A 9 1000Mb Switched Ether...

Страница 98: ...the Netra CT 820 server ship kit FIGURE A 13 RJ 11 Console Connector Diagram Only the signals transmit receive and ground are used The pinouts for this port are shown in TABLE A 10 Note DTE DB 9 also...

Страница 99: ...A 5 Netra CP2300 Board Pinouts FIGURE A 14 Netra CP2300 Board Following are the pinouts for each of the ports on the Netra CP2300 board Serial Connector on page A 16 PMC Connectors on page A 17 PMC c...

Страница 100: ...URE A 15 Front Panel Serial Port TTYA Diagram TABLE A 11 shows the serial port connector pin assignments TABLE A 11 Serial Mini Din 8 Pin Connector Pinouts Pin Signal Name Pin Signal Name 1 FP_SER_A_D...

Страница 101: ...onnectors and the following tables indicate contact allocations FIGURE A 16 Netra CP2300 Board PMC Port Connectors Note The P1386 1 standard reserves the Jn3 64 pin connector for PCI 64 bit extensions...

Страница 102: ...C_L 7 PMC_BUSMODE1_L1 8 VCC 5V 9 PMC_A_INT_D_L 10 NC 11 GND 12 NC 13 PMC_CLK 14 GND 15 GND 16 PMC_GNT_L 17 PMC_REQ_L 18 VCC 19 LOCAL_VIO 20 PCI_B_AD 31 21 PCI_B_AD 28 22 PCI_B_AD 27 23 PCI_B_AD 25 24...

Страница 103: ...5 PMC_TDI 6 GND 7 GND 8 NC 9 NC 10 NC 11 PMC_BUSMODE2_L 12 VDD 3 3V 13 PCI_B_RST_L 14 PMC_BUSMODE3_L 15 VDD 16 PMC_BUSMODE4_L 17 NC 18 GND 19 PCI_B_AD 30 20 PCI_B_AD 29 21 GND 22 PCI_B_AD 26 23 PCI_B...

Страница 104: ...GND 45 PCI_B_AD 14 46 PCI_B_AD 13 47 GND 48 PCI_B_AD 10 49 PCI_B_AD 8 50 VDD 51 PCI_B_AD 7 52 NC 53 VDD 54 NC 55 NC 56 GND 57 NC 58 NC 59 GND 60 NC 61 PCI_B_ACK64_L 62 VDD 63 GND 64 NC TABLE A 14 PMC...

Страница 105: ..._B_AD 17 33 PCI_B_FRAME_L 34 GND 35 GND 36 PCI_B_IRDY_L 37 PCI_B_DEVSEL_L 38 VCC 39 GND 40 PCI_B_LOCK_L 41 PMC_SDONE 42 PMC_SB0_L 43 PCI_B_PAR 44 GND 45 LOCAL_VIO 46 PCI_B_AD 15 47 PCI_B_AD 12 48 PCI_...

Страница 106: ...6 PMC_BUSMODE4_L 17 NC 18 GND 19 PCI_B_AD 30 20 PCI_B_AD 29 21 GND 22 PCI_B_AD 26 23 PCI_B_AD 24 24 VDD 25 PCI_B_IDSEL 26 PCI_B_AD 23 27 VDD 28 PCI_B_AD 20 29 PCI_B_AD 18 30 GND 31 PCI_B_AD 16 32 PCI_...

Страница 107: ...23 59 GND 60 NC 61 PCI_B_ACK64_L 62 VDD 63 GND 64 NC TABLE A 17 PMC B J11 Connector Interface Pin Description 1 64 PMC_B_IO 1 64 are user defined IO pins TABLE A 16 PMC B 12 Connector Interface Contin...

Страница 108: ...Transition Module for the Netra CP2300 Board Pinouts FIGURE A 17 Rear Transition Module for the Netra CP2300 Transition Card Connectors USB Serial port TTYB Serial port TTYA 10 100 Ethernet RJ45 conne...

Страница 109: ...The PIM A connector is switch selectable with the EIDE connector On the back of the Netra CP2300 cPSB board there are three DIP switches SW501 SW502 and SW503 When all of the positions on SW501 and SW...

Страница 110: ...o Signal 1 SMC_TX 2 12V 3 SMC_RX 4 5 5V 6 7 TXN_I2C_SDA 8 9 TXN_I2C_SCL 10 3 3V 11 I2C_PWR 12 13 GND 14 15 16 17 18 GND 19 RSV PCI_RST 20 21 5V 22 23 RSV 24 25 RSV 26 3 3V 27 28 29 GND 30 31 32 33 34...

Страница 111: ...PMC_A_IO_17 18 PMC_A_IO_18 19 PMC_A_IO_19 20 PMC_A_IO_20 21 PMC_A_IO_21 22 PMC_A_IO_22 23 PMC_A_IO_23 24 PMC_A_IO_24 25 PMC_A_IO_25 26 PMC_A_IO_26 27 PMC_A_IO_27 28 PMC_A_IO_28 29 PMC_A_IO_29 30 PMC_A...

Страница 112: ...2 53 PMC_A_IO_53 54 PMC_A_IO_54 55 PMC_A_IO_55 56 PMC_A_IO_56 57 PMC_A_IO_57 58 PMC_A_IO_58 59 PMC_A_IO_59 60 PMC_A_IO_60 61 PMC_A_IO_61 62 PMC_A_IO_62 63 PMC_A_IO_63 64 PMC_A_IO_64 TABLE A 20 PIM B C...

Страница 113: ...Connector J7 Pin No Signal Pin No Signal 1 PMC_B_IO_1 2 PMC_B_IO_2 3 PMC_B_IO_3 4 PMC_B_IO_4 5 PMC_B_IO_5 6 PMC_B_IO_6 7 PMC_B_IO_7 8 PMC_B_IO_8 9 PMC_B_IO_9 10 PMC_B_IO_10 11 PMC_B_IO_11 12 PMC_B_IO_...

Страница 114: ...37 PMC_B_IO_37 38 PMC_B_IO_38 39 PMC_B_IO_39 40 PMC_B_IO_40 41 PMC_B_IO_41 42 PMC_B_IO_42 43 PMC_B_IO_43 44 PMC_B_IO_44 45 PMC_B_IO_45 46 PMC_B_IO_46 47 PMC_B_IO_47 48 PMC_B_IO_48 49 PMC_B_IO_49 50 P...

Страница 115: ...Pins A 6 3 Serial Port Pinouts Two serial ports from the Netra CP2300 transition card are available through the rear panel with single stacked 9 pin connectors One connector is assigned to Port A and...

Страница 116: ...n the transition card s back panel provide two 10 100 Mbps fast Ethernet ports FIGURE A 21 Fast Ethernet Connector Pins TABLE A 23 Serial Port A Pin No Signal Pin No Signal 1 SER_A_DCD 6 SER_A_DSR 2 S...

Страница 117: ...assis s packet switched backplane PSB Ethernet network In order to use the transition card s Ethernet connectors you must set the 0 position of the Netra CP2300 board SW503 DIP switch on After setting...

Страница 118: ...A 34 Netra CT 820 Server Service Manual July 2004...

Страница 119: ...port on either the distributed management card or the rear transition card for the distributed management card For a direct login the connection you use varies depending on the Netra CT 820 server mo...

Страница 120: ...al port Hardwired modem connection No parity 9600 baud 1 stop bit 8 bit data 4 Test the connection Verify that communication has been established to the server and the keyboard display of the ASCII te...

Страница 121: ...ion serial port TTY B first ensure that the etc remote file on the Sun system contains an entry for hardwire Note Most releases of the Solaris operating system software shipped since 1992 contain an e...

Страница 122: ...the appropriate cable s and adapter s and make the necessary connections Use the information in TABLE B 3 to make the necessary connections 2 Set the following connection parameters No parity 9600 ba...

Страница 123: ...meter Conditions Description MIN NOM MAX Units Input Voltage DC Continuous input range 36 75 VDC Hold up Time From 48 VDC input 4 ms Input Current At full rated load 36 VDC 48VDC 7 6 5 4 A Input Prote...

Страница 124: ...summarizes the environmental specifications for the Netra CT 820 server The source of these specifications is NEBS GR 63 CORE Systems were subjected to these environments and passed all testing TABLE...

Страница 125: ...e while the software connection process requires operator assistance See hot swap full hot swap C CompactPCI A standard for computer boards and buses CompactPCI is adapted from the Peripheral Componen...

Страница 126: ...the ability to remove and replace cards from and in a running server See full hot swap basic hot swap M midplane The functional equivalent of a backplane The midplane is secured to the back of the ser...

Страница 127: ...t Interconnect PICMG is the group that promulgates the CompactPCI standard See CompactPCI R rear access The model of the Netra CT 820 server that is configured so that all of the cables come out from...

Страница 128: ...Glossary 4 Netra CT 820 Server Service Manual July 2004...

Страница 129: ...location at front of chassis 1 2 location at rear of chassis 1 3 F fan trays installing 6 5 part number 8 1 removing 6 4 H hot swap LED locating on the distributed management card 5 4 on the node boa...

Страница 130: ...s 5 4 A 2 console A 3 distributed management cards rear transition card 7 2 A 4 alarm 1A and 1B A 6 console 1A and 1B A 5 Ethernet 1A and 1B A 7 Netra CP2300 boards rear transition cards Ethernet A 32...

Страница 131: ...rt test 4 2 Ethernet test 4 2 Fan Status test 4 3 Fan Tachometer test 4 3 Flash test 4 2 FRU Presence test 4 3 FRUID Checksum test 4 4 Health test 4 2 I2C Temperature test 4 5 IPMI test 4 3 Power Supp...

Страница 132: ...Index 4 Netra CT 820 Server Service Manual July 2004...

Отзывы: