Summit Ice Melt Systems
PO Box 6928, Tahoe City, CA 96145
Ph: 530-583-8888 Fax: 530-583-7777
www.SummitIceMelt.com
Installation/Testing Log
Date: ____/_____/201_____
Summit Project # _________
Customer PO # __________
End User
Information:
Name:
Job Name:
Address:
Phone: Mobile:
Email:
Visual
Inspection:
Check for any signs of improper installation, check for cuts in outer jacket
Check that only Summit Ice Melt Systems products have been used
Verify Summit Ice Melt Systems Installation Instructions were reviewed and followed
Verify the heater cable does not lay unprotected over sharp edges
Verify heating cable attachment points are secure
Ice Melt System: [ ]
PRO
[ ]
LT
[ ]
HotSlot
[ ]
LowSlope
[ ]
Valley
[ ]
Standing Seam
Heating Cable Model # Number of Circuits: Megohmeter Mfgr:
Model # Voltage Setting: Date of last Megohmeter Calibration:
Visual Inspections, Multimeter and Megohmeter test performed by
Name: Company: Date: / /201__
Installer Information
Installation Log Sheet
Company:
[ ] Test #1: Upon shipment
[ ] Test #2: Upon Cable Installation prior to cover
[ ] Test #3: Prior to startup (at terminal blocks)
[ ] Insulation resistance test at 500, 1000, and 2500 Vdc.
[ ] Installation log sheet completed and attached
Address:
City, State, Zip:
Contact:
Phone: ( ) Mobile: ( )
Heating Cable Information
Fax: ( )
Project Application:
Email:
Heating Cable Length: Type:
Test #1:
Test #2: Test #3:
(Make copies as needed) Receipt of Material Before Covering Before Commissioning
Zone
Cable
Type
Length
Breaker
Number
Starting
Meter
Number
Ending
Meter
Number
Insulation
Resistance
(MΩ)
@500
Insulation
Resistance
(MΩ)
@1000
Insulation
Resistance
(MΩ)
@2500
Insulation
Resistance
(MΩ)
@500
Insulation
Resistance
(MΩ)
@1000
Insulation
Resistance
(MΩ)
@2500
Insulation
Resistance
(MΩ)
@500
Insulation
Resistance
(MΩ)
@1000
Insulation
Resistance
(MΩ)
@2500
Cable #1
Cable #2
Cable #3
Cable #4
Cable #5
Cable #6
Perform insulation resistance test at 500 and 1000Vac. The National Electrical Code recommends test at 2500 Vdc (Bypass controller if applicable)
Warning:
Disconnect all power before performing insulation resistance and continuity tests.
Important: In order to validate and qualify for the warranty, the above tests must be conducted on the installed heating cable and these completed results recorded and returned within 30 days via email, mail or fax
to Summit Ice Melt Systems. Upon receipt of this completed registration form and the Installation Log, SIMS will send the 10-Year Limited Warranty Extension acknowledgment to End User contact.
Page 23 of 29