![Summit Radiant Edge HotSlot Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/summit/radiant-edge-hotslot/radiant-edge-hotslot_installation-and-operation-manual_1391512008.webp)
Summit Ice Melt Systems
PO Box 6928, Tahoe City, CA 96145
Ph: 530-583-8888 Fax: 530-583-7777
www.SummitIceMelt.com
General Procedures
1.
Review the following:
A.
Packing List and materials provided
B.
Radiant Edge System Layout drawings (may be sent
separately) with panels identified, junction box and controller
locations noted, sensor location
C.
Access Equipment (ladders, scaffolding, safety harnesses,
etc.)
D.
On some systems, each cover and base panel is numbered.
If so, position each base piece on the roof as designated in
the Layout Drawings.
Tools Required
•
Chop saw, Skilsaw or portable
bandsaw with aluminum / copper
cutting blade
•
Megohmeter Tester: 500, 1000,
2500 Vdc
•
Multimeter
•
Tape Measure
•
Tin Snips
•
Wire cutter
•
Wire stripper
•
Straight edge knife
•
Drill
•
Driver for screws
•
3/8" metal bit
•
Deburring tool
•
Caulk and caulking gun
Additional Materials Needed
•
Cleaning solvent (i.e., denatured
alcohol) and rags for valley areas
•
Adhesive
•
Masking Tape
•
Touch Up Paint
•
Roofing Adhesive, DuraLink by
Chemlink, or equal
•
Roofing Sealant, DuraSil by
Chemlink, or equal
Page 7 of 29
Содержание Radiant Edge HotSlot
Страница 31: ...Notes ...