![Summit Radiant Edge HotSlot Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/summit/radiant-edge-hotslot/radiant-edge-hotslot_installation-and-operation-manual_1391512018.webp)
Summit Ice Melt Systems
PO Box 6928, Tahoe City, CA 96145
Ph: 530-583-8888 Fax: 530-583-7777
www.SummitIceMelt.com
Electrical Hookup
1.
It is recommended that a qualified electrician, licensed in the
jurisdiction of the installation, to conduct the hookup and testing of
the work.
2.
Route the heating cable from the Radiant Edge system to the
electrical junction box. Be sure to include a drip loop at the box.
3.
To complete the power connection, refer to the heating cable
Power Connection Kit instructions.
4.
For heating systems which a complete control system has not been
provided, Summit Ice Melt Systems requires a 30 milliamp ground
fault circuit breaker sized for the Radiant Edge ice melt system.
5.
Complete and return
Installation Log
(See Page 23)
WARNING:
Do NOT penetrate the heating cable protective jacket with
staples, nails, etc. or route the heating cable over sharp edges that could
abrade the jacket over time.
WARNING:
DO NOT use 5mA GFCI breakers, as they will likely cause
nuisance tripping and cause the heating system to malfunction.
Page 17 of 29
Содержание Radiant Edge HotSlot
Страница 31: ...Notes ...