![Sturtevant Richmont Programmable Torque Verifier FM II Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/sturtevant-richmont/programmable-torque-verifier-fm-ii/programmable-torque-verifier-fm-ii_owners-manual_1387399021.webp)
Page 19
Chapter 3 - Installation
Installation Considerations
The PTV-FM and FM Switch Wrenches use FM radio to communicate with each other. The
PTV-FM uses PLC cables to communicate with the rest of the facilitys' IT structure. The PTV-
FM communicates with the operator via visual and audio devices, and requires electric power.
The above, and the constraints they impose,must be taken into consideration when determining
where and how to install the PTV-FM. To insure proper functioning, we strongly recommend
that:
A. The PTV-FM be installed within 50 feet/15 meters or less of the station where the FM Switch
Wrench(es) will be used.
B. The installation location be in direct line-of-sight of the FM Switch Wrench use location. FM
signals are rapidly degraded by walls and other structures.
C. The installation be within 4 feet/1.2 meters of an appropriate electric power outlet.
D. The installation be within 20 feet /6 meters of any PLC controller to be used with the PTV-FM.
E. The PTV-FM be installed at no more than shoulder height. Access to the exterior of the unit
is often required.
F. For optimum productivity, the front of the unit should face the location where the operator will
use the FM Switch Wrenches.
Installation Procedure
This installation procedure is written for those units that will use a 110 VAC power source, and
which are set for 110 VAC power. If the unit purchased is to be used with 220 VAC power, and
was not purchased preset to 220 VAC power, see the section on changing voltage in the Power
Entry Module (PEM) before proceeding.
1. Three items from the box will be needed for the installation: the PTV-FM Generation II, the
Antenna, and the Power Cord.
2. Check the Power Setting Notice on the right side of the Generation II and insure it states the
Power Entry Module is set for 110 VAC power.
3. Check the power source to be used to power the Generation II and insure it is indeed 110
VAC.
Содержание Programmable Torque Verifier FM II
Страница 4: ...Page 2...
Страница 6: ...Page 4 Photograph 2 Photograph 3...
Страница 20: ...Page 18...
Страница 36: ...Page 34...