E/0204/39/73
maintenance procedures before starting to work;
· use protective gloves;
· open all contacts that bring power to the equipment before measuring resistance values;
· check that there is no high voltage in the low voltage circuits;
· do not use magnetic tools near strong magnetic fields.
20.3.6 SAFETY STANDARDS TO COMPLY WITH DURING MAINTENANCE
If continuous operation is not required, the system must be turned off.
Before beginning work, the following is required:
· check the maintenance person and make sure he is not carrying objects which could
become conductors;
· inspect the work site and make sure the floor is clean an dry;
· inspect work tools. These must be suited for the job to be done and be in good condition
in order to permit safe maintenance;
· measuring instruments must be periodically calibrated;
· check work procedures before starting the job. Check the wiring diagram and get an
overall picture of how the system is structured.
It is necessary, while maintenance is being done:
· for the maintenance person to be aware of which circuits are under high voltage;
· no resistance measurements must be made on live circuits;
· use only one hand when testing live circuits;
· ground the terminals of the instrument before measuring live circuits;
· always strictly comply with the suggestions mentionned above
Maintenance can be held to be terminated when all components have been reinstalled
and the unit has its original appearance.
Содержание Split-Air CST 40
Страница 2: ...E 0204 39 2...
Страница 14: ...E 0204 39 14 A B C B C A Dimensions Outside Unit CST 40 50 400 800 350 580 54 5...
Страница 15: ...E 0204 39 15 A B C B C A 54 5 Dimensions Outside Unit CST 60 80 450 950 400 640...
Страница 23: ...E 0204 39 23 Airflow Outside Unit CST Refrigerant connections Condenser fan Condenser Compressor...
Страница 69: ...E 0204 39 69 27 x 0 34 mm SIGNAL CABLE 3m SIGC3 SEQUENCING CABLE 2m SEQC2 RJ11 connector 4 conductors...