EN-33
DRAFT
5� Follow these steps in reverse for assembly�
• Push in the the fuse drawer until it clicks into place�
• Turn the global fuse holders in a clockwise direction until they are fully pushed in and secure in their
original position�
Perform Annual Inspection
Stryker recommends inspections of the system on an annual basis� These inspections evaluate whether the
product currently or in the near future may fail in a manner that affects device performance�
Safety Test
Visually inspect the device and its components to ensure the:
• fuses correspond with the specifications on the pump,
• labels and device markings are legible,
• mechanical condition of the system (wires, hardware, etc�) allows for its safe use, and
• the system is clean for safe and proper use�
Basic Function Test
Perform a basic function test to analyze the features, displays, and performance of the system�
1�
Power
• Power on the pump according to the instructions in “Power the CrossFlow Pump On and Off” section
of this manual� The power button will be illuminated by a green LED, indicating the system has
powered on�
2�
Stepper.motor
• Insert the cassettes according to the instructions in “Insert the Inflow/Outflow Cassette” section of
this manual�
• Visually inspect the stepper motors located in the cassette holder; they will be disengaged�
• Remove air from the inflow tubing according to the instructions in “Prime the Inflow Tubing” section
of this manual�
• Visually inspect the stepper motors; two motors will be engaged�
• Stop the pump�
• Visually inspect the stepper motors; they will be disengaged�
• Remove the cassettes according to the instructions in “Remove the Cassettes” section of this manual�
3�
Device.Detection
• Connect the components (for example, the hand control, footswitch, CrossFire system, etc�)
according to the instructions in “Connect the Components” section of this manual�
• Ensure the console displays the icon in the bottom of the screen of each component that is
connected when the device is powered on�
4�
Pressure.Sensor
Содержание CrossFlow
Страница 1: ...DRAFT 0450000000 CrossFlow Integrated Arthroscopy Pump DRAFT ...
Страница 2: ...DRAFT ...
Страница 4: ...EN 2 DRAFT Electromagnetic Compatibility 37 Regulatory Information 38 Symbols and Terminology 40 ...
Страница 46: ...EN 44 DRAFT ...
Страница 47: ...DRAFT ...