28
10 cm
Check, before mounting the lateral sheets, if the eaves sheet
has an overhang distance of 10 cm from the collector. If
necessary, adjust.
Assembly eaves sheet
Completely mounted eaves sheet left.
After clicking and aligning the left eaves sheet, fix it with the
three supplied glands in the pre-punched holes.
1910001 tool set
Where the lateral sheet has an overhang fixate the eaves
sheet with a nail at the maximum of 8 cm from the top. Where
appropriate, a additional rail has to be mounted.
By means of the sheet seam the lateral sheet has
to be adjusted to the roofing.
Turn the screws 90° clockwise.
Содержание FKF 200
Страница 1: ...Assembly instructions Solar collectors FKF 200 240 270 Roof integrated installation...
Страница 43: ...43 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 44: ...44 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 45: ...45 Notes Initial operation...
Страница 46: ...46 Notes Initial operation...