22
Collector connections
The cap will be mounted everywhere where a collector
connection is not used.
1310209 Cap set (2 pieces complete)
1310119 Cap set aluminium (2 pieces complete)
Connection 3/4“
1310205 Collector connection set R3/4“
(2 pieces complete without cap)
Connection for soldering or clamping ring transition
1310204 Collector connection set 22 mm
(2 pieces complete without cap)
1310114 Collector connection set 22 mm aluminium
(2 pieces complete without cap)
Completely mounted air eliminator with extension.
1310208 Air eliminator set with extension pipe
(compl. with caps)
The required connection dimension für the mentioned collector
connections has to be calculated by the scheduler of the
installation depending on the regional circumstances (lengths
of the pipelines, additional resistors etc.)
The accessibility has to be given. For multi-row systems the
mounting of the air eliminatior is made in the top row.
The connection lines or lateral manifolds should be
safeguarded with a clamp in the region of the collector
connections on the warm and the cold side for a
relaxation of the tension. This has to be carried out by
the customer.
Содержание FKF 200
Страница 1: ...Assembly instructions Solar collectors FKF 200 240 270 Roof integrated installation...
Страница 43: ...43 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 44: ...44 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 45: ...45 Notes Initial operation...
Страница 46: ...46 Notes Initial operation...