12
1
2
3
3
2
1
Assembly preparation - sequence
Single-row collector field
When assembling single-row collector fields, the collectors will be mounted starting with the respectively outer collector.
The exact assembly of the collectors will be described starting with page 29.
Assembly sequence
or
Single-row collector field
Multi-row collector field
When assembling mulit-row collector fields, the collectors which are located one above the other will be mounted first of
all. After placing the first collector, the second collector will be adjusted above the first one. The collectors which are lying
one above the other have to be aligned accurately. The exact assembly of the collectors will be described starting with
page 32.
Multi-row collector field
Содержание FKF 200
Страница 1: ...Assembly instructions Solar collectors FKF 200 240 270 Roof integrated installation...
Страница 43: ...43 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 44: ...44 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 45: ...45 Notes Initial operation...
Страница 46: ...46 Notes Initial operation...