19
Assembly of the solar collectors
On the outside is the collector mount by three connection
plates.
If the collector fixing point is on a picket kick, a adiitional roof
lath must be mounted below. On the mounting must be on the
additional roof lath.
1400103 collector connection set roof integrated 2014
1910101 tool set 2014
The collector will be mounted on one side with three collector
connection plates
1400103 collector connection set roof integrated 2014
1910101 tool set 2014
It must be ensured that the collector connection
plates don‘t lie under a hydraulic connector. Because
the hydraulic connector covers the screw of the
connection plate the final mounting of the collector
connection plates is not possible
On the inside (between the collectors) are also three connection
plates mount. The distance between the two collectors is given
by the connection plate.
The connection plate engages left and right into the collector
profile.
Содержание FKF 200
Страница 1: ...Assembly instructions Solar collectors FKF 200 240 270 Roof integrated installation...
Страница 43: ...43 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 44: ...44 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 45: ...45 Notes Initial operation...
Страница 46: ...46 Notes Initial operation...