1. Remove valve and heater from carton.
Remove the three screws from each venturi
collector bell located on one end of the
heater.
2. Slide valve onto collector bells and insert
two vertical screws. Then install remaining
four screws.
3. To avoid possible damage to wiring connec-
tion, it may be advantageous to hang heater
before connecting wires. Connect two gray
wires to the flame sensors located by the
electrodes. Connect the two spark-plug
type high tension leads to the Electronic
Ignition Control. If a thermostat is used,
separate the two red wires that are twisted
together and connect the thermostat
between them. If a thermostat is not used,
connect the red wires to the positive side
of the power source and the single blue
wire to the negative via a switch.
HEATER INSTALLATION
Installation of Sterling Gas Fired Infra-Red
Heaters should conform to all Sterling Heating
Installation Design Procedures including ventila-
tion. All local and national codes requirements,
or in the absence of local codes, the National
Electrical Code (NFPA No. 70) and the National
Fuel Gas Code (ANSI A223.1 – latest edition)
in the U.S.A. or in Canada CSA B149.1-00 shall
be followed. ANSI Z223.1, is available from
the International Gas Association 8501 East
Pleasant Valley Road, Cleveland OH 44131,
and all NFPA codes are available from National
Fire Prevention Association, Batterymarch Park,
Quincy, NA 02269.