Sterling SDRIOM-2 Скачать руководство пользователя страница 2

2

SECTION II - GENERAL INFORMATION

I.

As is the case with any fine piece of equipment, care must

be taken to provide the proper attention to the operation
and maintenance details of this machine.

This manual of instructions has been prepared in order for
you to become well-acquainted with those details, and in
doing so, you will be able to give your Direct Gas-Fired
System the care and attention which any piece of 
equipment needs and deserves.

Table Of Contents

Section I: Forward and Table of Contents........................ 2
Section II: General Information........................................... 2
Section III: Installation............................................................ 3
Section IV: Pre Start-Up........................................................ 5
Section V: Unit  Start-Up........................................................ 5
Section VI: Unit Shut Down.................................................. 6
Section VII: Troubleshooting  Guide..................................... 7
Section VIII: Maintenance Schedule and

Lubrication Requirements............................ 13

Section IX: Maxon NP-I Airflo® Burners........................ 16
Section X: Maxitrol Valve Adjustments and

Preliminary Circuit Analysis............................17

Section XI: Replacement Parts........................................... 19
Section XII: Recirculation.................................................... 20

SECTION I - FORWARD

A. Purpose

The purpose of this manual is to present a guide for proper
installation, maintenance, and operation of the Direct Gas-
Fired System, and supplement, but not to replace, the 
services of qualified field service personnel to supervise the
initial start-up and adjustment of the unit. Persons without
previous experience with commercial and industrial heating
equipment should not attempt the initial adjustment and
checkout procedure which is essential before such 
installations may be considered ready for operation. This
manual should be made readily available to all operating
personnel as an aid in troubleshooting and proper 
maintenance.

B. Shipping

Direct Gas-Fired units are shipped completely assembled
where shipping limitations allow. Optional inlet hoods 
or other large accessories are assembled and shipped
mounted and wired whenever possible within limitations of
shipping and handling. Any optional accessories shipped
separately are shipped as assembled sections.

Shipments are made F.O.B. Dallas,Texas by flatbed truck 
or LTL shipment. The unit is securely strapped, tied, and
blocked to prevent shipping damage. All shipments are
checked by an inspector before they are accepted by the
carrier. Parts that are shipped unmounted are noted 
on the bill of lading. These parts, where feasible, are
packaged and shipped with the units. Upon receipt of
shipment, all units should be checked against the bill of
lading to insure all items have been received. All equipment
(and any optional accessories) should be checked carefully
for physical damage in the presence of the carrier’s 
representative. If parts are missing or damage has occurred,
a claim should be filed immediately with the carrier.

All Direct Gas-Fired units are given a minimum 140 point
operations test and control circuit checkout before ship-
ment. Copies of the wiring diagram, piping diagram and bill
of material are included with each unit shipped.
If correspondence with the factory is necessary, please
provide the unit model and serial number.

C. Optional Factory Service

Periodic service on any piece of mechanical equipment 
is necessary for efficient operation. A nationwide service
support network is available to provide quick and dependable
servicing of make-up air, heating, ventilating, or air handling
types of equipment. The factory also offers start-up service
which includes the presence of a service engineer to
supervise the initial start-up and adjustment of the equipment
and provide instructions for the owner’s maintenance 
personnel on proper operations and maintenance. Consult
factory for quotations on periodic or start-up service.

Содержание SDRIOM-2

Страница 1: ...age injury or death Read the installation operating and maintenance instructions thoroughly before installing or servicing this equipment WARNING Install operate and maintain unit in accordance with m...

Страница 2: ...allow Optional inlet hoods or other large accessories are assembled and shipped mounted and wired whenever possible within limitations of shipping and handling Any optional accessories shipped separa...

Страница 3: ...sed to the weather Rotate fan monthly B Locating the Unit Prior to locating the unit authorities having jurisdiction should be consulted before installations are made Approval permits should be checke...

Страница 4: ...be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1 2 PSI...

Страница 5: ...belts for tightness tension and alignment Do not over tighten belts 6 Check set screws on all bearings pulleys and fans for tightness 7 Check voltage supplied to disconnect switch The maximum voltage...

Страница 6: ...using soap solution Unit will run for 5 seconds before ignition trial NOTE 3 OR 4 TRIALS MAY BE NEEDED TO PURGE AIR FROM GAS LINE UnitedTechnologies Electronic Controls Spark Ignitor Watch microammete...

Страница 7: ...replaced When checking operation of air pressure switches on systems without pilot the heat switch will have to be turned off approximately five seconds to reset the igni tion control E Temperature C...

Страница 8: ...oltage at ignition control C Burner does not light after 5 sec onds pre purge of flame safeguard relay and there is voltage at igni tion control 1 Check power source 2 Check and replace 3 Close or con...

Страница 9: ...valves If gas pressure matches unit rating plate and valve does not open replace gas valve or actuator 10 Make sure spark rod is producing a sufficient spark to light off burner make sure porcelain i...

Страница 10: ...10 SECTION VII TROUBLESHOOTING P 001004 P 001003...

Страница 11: ...d modulating voltages are still not obtained amplifier may be assumed faulty Replace 1 Replace modulator head if not approximately 45 55 ohms for M611Valve and 60 80 ohms for MR212 Valve 2 Clean or re...

Страница 12: ...let to modulating valve using a manometer with unit operating at full fire Pressure should be equal to the sum of outlet pres sure setting plus pressure drop of the valve 2 Read manifold pressure usin...

Страница 13: ...between amplifier and modulator valve 1 Override Temperature setting is too low 2 Burner capacity may be insufficient 1 Faulty automatic control valve 2 Open wire to automatic valve 13 Symptom Possib...

Страница 14: ...inals 4 5 Set T244 or TD244 to max imum setting Measure resistance across wires Meter should read 6000 ohms 1000 T244 If TS244 TD244 are used meter should read 4500 ohms 1000 TS244 and 2100 ohms 150 T...

Страница 15: ...cessary 1 Move TS144 to location where average temperature can be sensed 2 If proper temperatures are not observed refer to Discharge Air Temperature calibration procedures 1 Clean replace valve and o...

Страница 16: ...h pressure regulator to match the appliance rating a Remove the pressure regulator adjustment cap b Using a screwdriver turn the inner adjustment screw for HI pressure clockwise to increase or counter...

Страница 17: ...sure that no com bustible or hazardous material has been stored within the clearances as shown on the unit name plate 3 Quarterly a Complete the monthly maintenance schedule b Check the belt tension f...

Страница 18: ...casing of the motor Add a small amount of a clean good grade ball bearing grease such as Exxon Polyrex EM or equal with a low pressure grease gun Run the motor five minutes before removing the grease...

Страница 19: ...inspection covers some filter racks and some outdoor air dampers Inspect gaskets periodically and repair or replace as required G Heater 1 At least a yearly inspection is recommended for heating insta...

Страница 20: ...e solution 5 Inspect the support means to be sure that everything is firmly anchored in place SECTION IX MAXON NP I AIRLO BURNERS Inspection and Maintenance of Gas Ports Conduct initial inspection wit...

Страница 21: ...ontinuous low fire 2 Remove cap B and loosen lock screw C Turn D to desired low fire adjustment Clockwise rotation reduces minimum flow rate 3 Tighten screw C replace cap B and reconnect wire to ampli...

Страница 22: ...m can be isolated to the electronics and this may once again be reviewed in the check list After test remove the test resistor and reconnect the Discharge Air Sensor to terminals 3 and 4 If Remote Tem...

Страница 23: ...lem is identified with the space temperature sensing and or temperature selecting components and circuits See Troubleshooting Guide If proper delivered air temperatures are not observed check calibrat...

Страница 24: ...cient ventilation air which results in inadequate dilution of combustion products gen erated by the heater may create hazardous concentrations of carbon monoxide nitrogen dioxide and other combus tion...

Отзывы: