Sterling SDRIOM-2 Скачать руководство пользователя страница 17

1. Turn off gas supply.
2. Set thermostat or controller above room temperature

to call for heat.

3. Watch for ignition spark or for glow at hot surface

igniter either immediately or following prepurge. See IP
module specifications.

4. Time the length of the spark operation. See the IP 

module specifications.

5. After the module locks out, open the manual gas cock

and make sure no gas is flowing to the pilot or main
burner

.

With modules that continue to spark until the pilot

lights or the system shuts down manually, the pilot should
light when the manual gas control knob is opened.

6. Set the thermostat below room temperature and wait

one minute.

7. Operate system through one cmplete cycle to make

sure all controls operate properly

17

SECTION VIII - MAINTENANCE SCHEDULE AND LUBRICATION REQUIREMENTS

Periodic maintenance is essential to the efficient operation
and extended service life of this equipment. Failure to pro-
vide maintenance as recommended may void the equip-
ment warranty.

A. Maintenance Schedule

1. Weekly

a.

Check that fan belts are tight and sheaves are 
aligned.The fan belts can be checked every 
30 days after the first 60 days of new belt run-in.

CAUTION: Do not overtighten belts.

2. Monthly

a.

Check all valves, piping and connections for leaks.

b.

Check the flame signal.

c.

Check the fuel pressure in the fuel supply line to 
each heater.

d.

Check the burner manifold pressure at full fire and
that low fire has a continous flame all across burner.

e.

Clean the flame sensor(s).

f.

Inspect filters. Clean or replace as necessary.

g.

Inspect the main fan bearings.

h.

Check all dampers, damper actuators and linkages.
Adjust and tighten if necessary.

i.

Ensure that there are no obstruction blocking the 
air supply to the heater or the air discharge from 
the heater.

j.

Inspect the area and make sure that no com-
bustible or hazardous material has been stored 
within the clearances as shown on the unit name-
plate.

3. Quarterly

a.

Complete the monthly maintenance schedule.

b.

Check the belt tension for the main fan(s) and 
adjust if necessary.

c.

Check the alignment of the sheaves and adjust if 
necessary.

d.

Inspect all bearings set screws for tightness and 
lubricate bearings if necessary.

e.

Check the pilot electrical system (if applicable).
Adjust if necessary.

f.

Check the pilot assembly (if applicable). Clean and 
adjust if necessary.

g.

Inspect the burner carefully. Clean and adjust if 
necessary.

h.

Check voltages and amp draw on main fan motor.

i.

Check the operation of all safety controls 
individually.

j.

Check the operation of the automatic gas shut off 
valves and check them for leakage at the pressure 
test ports provided.

4. Off Season or Yearly

a.

Complete the monthly and quarterly maintenance 
schedule.

b.

Inspect all fan wheels and housings. Clean if 
necessary.

c.

Check that all fan wheels and sheaves are securely 
set on the shaft.

d.

Inspect all bearings and alignment. Adjust if 
necessary.

e.

Inspect all V-belts. Replace if necessary.

f.

Inspect all electrical components, connections and 
terminals. Clean and tighten where necessary.

g.

Test ignition spark. Adjust gap if necessary.

h.

Clean ignition electrodes and check for cracks.

i.

Test flame safeguard relay and replace components 
if necessary.

j.

Inspect all regulators, relief valves, motorized 
valves, solenoid valves, vent valves, manual shut off 
valves and safety shut off valves. Check their oper-
ation and clean as necessary.

k.

Ensure all vents to the atmosphere are clean and 
free from obstruction.

l.

Inspect and clean all drip legs in the fuel line.

m. Lubricate fan motor as directed by motor manu-

facturer.

n.

Inspect fan motor wiring for loose connections.

o.

Lightly oil all door latches.

p.

Check that cabinet is weathertight, replace door
gaskets and recaulk as necessary.

NOTE: Keep screened air intakes clear of obstruc-
tions at all times.

Содержание SDRIOM-2

Страница 1: ...age injury or death Read the installation operating and maintenance instructions thoroughly before installing or servicing this equipment WARNING Install operate and maintain unit in accordance with m...

Страница 2: ...allow Optional inlet hoods or other large accessories are assembled and shipped mounted and wired whenever possible within limitations of shipping and handling Any optional accessories shipped separa...

Страница 3: ...sed to the weather Rotate fan monthly B Locating the Unit Prior to locating the unit authorities having jurisdiction should be consulted before installations are made Approval permits should be checke...

Страница 4: ...be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1 2 PSI...

Страница 5: ...belts for tightness tension and alignment Do not over tighten belts 6 Check set screws on all bearings pulleys and fans for tightness 7 Check voltage supplied to disconnect switch The maximum voltage...

Страница 6: ...using soap solution Unit will run for 5 seconds before ignition trial NOTE 3 OR 4 TRIALS MAY BE NEEDED TO PURGE AIR FROM GAS LINE UnitedTechnologies Electronic Controls Spark Ignitor Watch microammete...

Страница 7: ...replaced When checking operation of air pressure switches on systems without pilot the heat switch will have to be turned off approximately five seconds to reset the igni tion control E Temperature C...

Страница 8: ...oltage at ignition control C Burner does not light after 5 sec onds pre purge of flame safeguard relay and there is voltage at igni tion control 1 Check power source 2 Check and replace 3 Close or con...

Страница 9: ...valves If gas pressure matches unit rating plate and valve does not open replace gas valve or actuator 10 Make sure spark rod is producing a sufficient spark to light off burner make sure porcelain i...

Страница 10: ...10 SECTION VII TROUBLESHOOTING P 001004 P 001003...

Страница 11: ...d modulating voltages are still not obtained amplifier may be assumed faulty Replace 1 Replace modulator head if not approximately 45 55 ohms for M611Valve and 60 80 ohms for MR212 Valve 2 Clean or re...

Страница 12: ...let to modulating valve using a manometer with unit operating at full fire Pressure should be equal to the sum of outlet pres sure setting plus pressure drop of the valve 2 Read manifold pressure usin...

Страница 13: ...between amplifier and modulator valve 1 Override Temperature setting is too low 2 Burner capacity may be insufficient 1 Faulty automatic control valve 2 Open wire to automatic valve 13 Symptom Possib...

Страница 14: ...inals 4 5 Set T244 or TD244 to max imum setting Measure resistance across wires Meter should read 6000 ohms 1000 T244 If TS244 TD244 are used meter should read 4500 ohms 1000 TS244 and 2100 ohms 150 T...

Страница 15: ...cessary 1 Move TS144 to location where average temperature can be sensed 2 If proper temperatures are not observed refer to Discharge Air Temperature calibration procedures 1 Clean replace valve and o...

Страница 16: ...h pressure regulator to match the appliance rating a Remove the pressure regulator adjustment cap b Using a screwdriver turn the inner adjustment screw for HI pressure clockwise to increase or counter...

Страница 17: ...sure that no com bustible or hazardous material has been stored within the clearances as shown on the unit name plate 3 Quarterly a Complete the monthly maintenance schedule b Check the belt tension f...

Страница 18: ...casing of the motor Add a small amount of a clean good grade ball bearing grease such as Exxon Polyrex EM or equal with a low pressure grease gun Run the motor five minutes before removing the grease...

Страница 19: ...inspection covers some filter racks and some outdoor air dampers Inspect gaskets periodically and repair or replace as required G Heater 1 At least a yearly inspection is recommended for heating insta...

Страница 20: ...e solution 5 Inspect the support means to be sure that everything is firmly anchored in place SECTION IX MAXON NP I AIRLO BURNERS Inspection and Maintenance of Gas Ports Conduct initial inspection wit...

Страница 21: ...ontinuous low fire 2 Remove cap B and loosen lock screw C Turn D to desired low fire adjustment Clockwise rotation reduces minimum flow rate 3 Tighten screw C replace cap B and reconnect wire to ampli...

Страница 22: ...m can be isolated to the electronics and this may once again be reviewed in the check list After test remove the test resistor and reconnect the Discharge Air Sensor to terminals 3 and 4 If Remote Tem...

Страница 23: ...lem is identified with the space temperature sensing and or temperature selecting components and circuits See Troubleshooting Guide If proper delivered air temperatures are not observed check calibrat...

Страница 24: ...cient ventilation air which results in inadequate dilution of combustion products gen erated by the heater may create hazardous concentrations of carbon monoxide nitrogen dioxide and other combus tion...

Отзывы: