7-2
764333-675
b. Use the four lid spacers (PIN 100707) and
four shims (PIN 100706) (included in the
SYSTEM 1E tool kit) and equally space
them around the four sides of the seal to
establish the correct lid height. These
spacers and shims fit over the seal and seal
retainers.
c.
Close the lid and loosen the screws on the
latch brackets and let the latch claws hang
from the lid wire hooks.
d. If the latch claws and the wire hooks do
not align properly (see diagram below) tap
the hooks with a soft blow hammer so that
the cylinder part of the lid wire hook and
the curved part of the latch claw are
aligned. Both sides should make contact as
shown in the picture. Use the handle travel
adjustment setscrew to make any
necessary adjustment.
e.
After all adjustments have been made
tighten the screws. Reinsert the roll pins
drilling new holes if necessary.
f.
Verify the lid opens and closes easily and
make sure the lid wire hooks clear the latch
properly and do not contact the drip pan
when closed. Also verify that wire hooks
seat with latch claws properly.
g. It may be necessary to push down slightly
on lid to allow the latch claws to clear the
wire hooks when opening the lid.
17. Once lid is adjusted and all screws are tightened,
install gas cylinder from bracket on frame to lid
and insert clevis pin into gas cylinder. Adjust lid
opening speed with clevis pin.
18. Install retaining ring on bottom of gas cylinder;
tighten set screw into lid to lock clevis pin in place.
19. Install black hose on float block assembly and
tighten hose clamp.
20. Close lid and ensure latch flag is still in adjustment.
21. Reinstall shroud.
22. Once shroud is installed, install water lines (drain
and inlet), plug unit back into power source. Run
test cycles and check for leaks.
7.2
LID SWITCH AND LATCH FLAG
ADJUSTMENT PROCEDURE
Equipment, Fixtures, Special Tools:
1. Voltmeter (VOM) with micro clip leads.
2. One 0.020” shim.
3. One 0.060” shim.
4. Feeler gauge if 0.020 and 0.060 shim not available.
Procedure:
1. Remove power cord from wall receptacle.
2. Turn OFF water supply to SYSTEM 1E Liquid
Chemical Sterilant Processing System, depress red
button to relieve pressure at housing of pre-filter.
3. Disconnect drain hose from back side of
SYSTEM 1E Processor and install cap.
4. Disconnect inlet water hose from back side of
SYSTEM 1E Processor and install cap.
5. Remove adapter tray from inside cavity of
SYSTEM 1E Processor and set aside.
6. Siphon water from both QD posts and install caps
on all three posts.
7. Remove shroud from SYSTEM 1E Liquid Chemical
Sterilant Processing System and set aside.
8. Plug power cord into wall receptacle.
9. Remove cover from control interface box and set
aside.
10. Connect VOM to Pin 10 (Ground) and Pin 6 on
CN9 Connector. (Open reads 5V.)
11. Visually examine that the connector is connected
to limit switch.
12. Visually examine latch flag assembly for damage.
Latch flag should be approximately parallel to the
latching hook (see Figure 7-3).
NOTE: Top view looking down through slot left
side.
13. With lid assembly closed, connect VOM to Pin 10
and Pin 6 on CN9 connector.
Proper wire hook
and latch claw
alignment
Содержание SYSTEM 1E
Страница 1: ...MAINTENANCE MANUAL SYSTEM 1E Liquid Chemical Sterilant Processing System 12 09 10 P764333 674 ...
Страница 3: ......
Страница 71: ...5 19 764333 675 Figure 5 2 Analog Cable Assembly Pin Out Locations ...
Страница 72: ...5 20 764333 675 Figure 5 3 DC Input Harness Pin Out Locations Figure 5 4 DC Power Harness Pin Out Locations ...
Страница 74: ...5 22 764333 675 Figure 5 7 DC Power Supply Harness Pin Out Locations PS P1 ...
Страница 96: ...7 19 764333 675 Figure 7 17 Aquafine STERIUV5 Control Panel The Control Panel A B 3 2 1 ...
Страница 108: ......
Страница 110: ...ii 764333 676 Example 1 How To Use IPB Page Typical ...
Страница 119: ...10 764333 676 Figure 1 SYSTEM 1E Piping Schematic ...
Страница 121: ...12 764333 676 Figure 2 SYSTEM 1E Complete 4 3 2 ...
Страница 123: ...14 764333 676 Figure 3 Frame Components Panels 2 1 13 22 21 10 11 10 9 8 6 24 23 5 4 3 7 24 12 ...
Страница 128: ...19 764333 676 Figure 5 Fluid and Air Components 2 of 2 51 53 48 47 50 49 52 ...
Страница 133: ...24 764333 676 Figure 7 Float Block Switch Assembly 1 5 8 7 5 4 10 4 2 6 9 9 3 CK2 CK3 LS3 CK1 ...
Страница 137: ...28 764333 676 Figure 9 Drain Block Assembly 3 4 5 6 7 3 1 2 8 CK8 TC3 ...
Страница 143: ...34 764333 676 Figure 12 Bulkhead Connector Assembly 1 2 2 2 3 1 1 3 5 4 4 6 ...
Страница 155: ...46 764333 676 Figure 18 Harness Cable Assemblies 1 of 2 1 2 3 4 5 6 P10 PT1 P5B P11 P2 P5A ...
Страница 166: ......
Страница 167: ......
Страница 168: ......
Страница 169: ......
Страница 170: ......