7-7
764333-675
7.7
SEAL REPLACEMENT PROCEDURE
Replace inflatable seal as follows.
Procedure:
1. Turn power OFF to unit.
2. Open Lid assembly and remove device tray.
3. Pull inflatable seal out of retaining bars and corner
clips.
4. Pull air line from hole in drip pan assembly and
disconnect quick disconnect coupler.
5. Check retaining bars and clips for any sharp edges.
Remove any sharp edges with sand paper or file.
6. Install new inflatable seal by connecting quick
disconnect coupler. Pull on line and coupler to
ensure it is connected properly.
7. Place inflatable seal in forward retaining bar at an
angle pushing under retaining bar lip.
8. Using a 1/8” Allen wrench elbow (rounded edge),
push the other side under opposite lip of retaining
bar. Repeat for each retaining bar and clip.
9. Use
S
ECTION
6.4.7
S
EAL
L
EAK
T
EST
AND
C
OMPRESSOR
O
UTPUT
T
EST
to check new seal for any leaks prior
to running a liquid chemical sterilant processing
cycle.
7.8
PINCH VALVE SLEEVE
REPLACEMENT PROCEDURE
Procedure:
1. Turn OFF power and water supply to SYSTEM 1E
Liquid Chemical Sterilant Processing System.
2. Remove shroud.
3. Using a strap wrench or similar tool, loosen caps on
both ends of pinch valve. Remove body from
SYSTEM 1E Liquid Chemical Sterilant Processing
System.
4. Remove old pinch valve sleeve.
5. Clean body and caps of any foreign matter.
6. Install new sleeve into valve body.
7. Apply Vacuum Grease P/N 400033 to both faces of
the sleeve.
8. Install body and hand-tighten both caps. Caps are
fully tight when a 0.030" (±0.005") gap (use a feeler
gauge) is present between the cap and the body. See
Figure 7-14.
Figure 7-12. Connect Quick Disconnect
Coupler
Figure 7-13. Press Seal in Place Using Allen
Wrench Elbow
Содержание SYSTEM 1E
Страница 1: ...MAINTENANCE MANUAL SYSTEM 1E Liquid Chemical Sterilant Processing System 12 09 10 P764333 674 ...
Страница 3: ......
Страница 71: ...5 19 764333 675 Figure 5 2 Analog Cable Assembly Pin Out Locations ...
Страница 72: ...5 20 764333 675 Figure 5 3 DC Input Harness Pin Out Locations Figure 5 4 DC Power Harness Pin Out Locations ...
Страница 74: ...5 22 764333 675 Figure 5 7 DC Power Supply Harness Pin Out Locations PS P1 ...
Страница 96: ...7 19 764333 675 Figure 7 17 Aquafine STERIUV5 Control Panel The Control Panel A B 3 2 1 ...
Страница 108: ......
Страница 110: ...ii 764333 676 Example 1 How To Use IPB Page Typical ...
Страница 119: ...10 764333 676 Figure 1 SYSTEM 1E Piping Schematic ...
Страница 121: ...12 764333 676 Figure 2 SYSTEM 1E Complete 4 3 2 ...
Страница 123: ...14 764333 676 Figure 3 Frame Components Panels 2 1 13 22 21 10 11 10 9 8 6 24 23 5 4 3 7 24 12 ...
Страница 128: ...19 764333 676 Figure 5 Fluid and Air Components 2 of 2 51 53 48 47 50 49 52 ...
Страница 133: ...24 764333 676 Figure 7 Float Block Switch Assembly 1 5 8 7 5 4 10 4 2 6 9 9 3 CK2 CK3 LS3 CK1 ...
Страница 137: ...28 764333 676 Figure 9 Drain Block Assembly 3 4 5 6 7 3 1 2 8 CK8 TC3 ...
Страница 143: ...34 764333 676 Figure 12 Bulkhead Connector Assembly 1 2 2 2 3 1 1 3 5 4 4 6 ...
Страница 155: ...46 764333 676 Figure 18 Harness Cable Assemblies 1 of 2 1 2 3 4 5 6 P10 PT1 P5B P11 P2 P5A ...
Страница 166: ......
Страница 167: ......
Страница 168: ......
Страница 169: ......
Страница 170: ......