![Steris SYSTEM 1E Скачать руководство пользователя страница 51](http://html.mh-extra.com/html/steris/system-1e/system-1e_maintenance-manual_1374323051.webp)
4-3
764333-675
9. Replace processing tray.
• Replace processing tray in chamber. Place
processing container and/or accessory rack on
processing tray (if applicable).
10. Check printer paper (Figure 4-8).
• Open printer paper access cover and check
printer paper supply. Replace printer paper
roll, if necessary.
11. Check printer ribbon.
• Check print quality from previous day’s
printouts. Replace ribbon as needed. (Refer to
12. Review Printouts.
• Check printouts for any indication of cycle
faults or excessive fill times. Contact a service
representative for repairs, when necessary.
Refer to
for filter check valves change
procedures.
4.3 Preventive Maintenance Schedule
Follow the schedule below to properly maintain this
equipment. Frequency of inspections will depend on
the usage of the unit. Recommended minimums are
listed below. Where "Each" is indicated below, the step
is to be performed at each inspection.
Figure 4-8. Check Printer Paper Supply and
Ribbon, Verify Print Quality
Table 4-1. Preventive Maintenance Schedule
Service Required
Frequency
1.0 Preparation
1.1 Discuss operation with equipment operators and check printouts
Each
1.2 Follow lock-out/tag-out procedures
Each
2.0 Filters
2.1 Replace sterile air filter
2x/year
2.2 Replace MaxPure™ Filter
Every 90 days
2.3 Verify pre-filters for proper performance
Each
3.0 Valves
3.1 Replace CK1, CK2, CK3, CK11
4x/year
3.2 Rebuild CK8
1x/year
3.3 Replace pinch valve sleeves
Every 2000
Cycles
3.4 Verify performance of CK1, CK2, CK3, CK4, CK5, CK6, CK7, CK8, CK10 and CK11
Each
3.5 Verify performance of SOL1, SOL2, SOL3, SOL4, SOL5, SOL7 and SOL8
Each
Содержание SYSTEM 1E
Страница 1: ...MAINTENANCE MANUAL SYSTEM 1E Liquid Chemical Sterilant Processing System 12 09 10 P764333 674 ...
Страница 3: ......
Страница 71: ...5 19 764333 675 Figure 5 2 Analog Cable Assembly Pin Out Locations ...
Страница 72: ...5 20 764333 675 Figure 5 3 DC Input Harness Pin Out Locations Figure 5 4 DC Power Harness Pin Out Locations ...
Страница 74: ...5 22 764333 675 Figure 5 7 DC Power Supply Harness Pin Out Locations PS P1 ...
Страница 96: ...7 19 764333 675 Figure 7 17 Aquafine STERIUV5 Control Panel The Control Panel A B 3 2 1 ...
Страница 108: ......
Страница 110: ...ii 764333 676 Example 1 How To Use IPB Page Typical ...
Страница 119: ...10 764333 676 Figure 1 SYSTEM 1E Piping Schematic ...
Страница 121: ...12 764333 676 Figure 2 SYSTEM 1E Complete 4 3 2 ...
Страница 123: ...14 764333 676 Figure 3 Frame Components Panels 2 1 13 22 21 10 11 10 9 8 6 24 23 5 4 3 7 24 12 ...
Страница 128: ...19 764333 676 Figure 5 Fluid and Air Components 2 of 2 51 53 48 47 50 49 52 ...
Страница 133: ...24 764333 676 Figure 7 Float Block Switch Assembly 1 5 8 7 5 4 10 4 2 6 9 9 3 CK2 CK3 LS3 CK1 ...
Страница 137: ...28 764333 676 Figure 9 Drain Block Assembly 3 4 5 6 7 3 1 2 8 CK8 TC3 ...
Страница 143: ...34 764333 676 Figure 12 Bulkhead Connector Assembly 1 2 2 2 3 1 1 3 5 4 4 6 ...
Страница 155: ...46 764333 676 Figure 18 Harness Cable Assemblies 1 of 2 1 2 3 4 5 6 P10 PT1 P5B P11 P2 P5A ...
Страница 166: ......
Страница 167: ......
Страница 168: ......
Страница 169: ......
Страница 170: ......