SBM-500
SBM-
500 Operator’s Manual
20
3.7. Operating
Connect the machine to the power source and use the switch (
1
, Fig. 12) to turn on
the power. On the control panel, press START, and then start the SPINDLE and
FEED. Use knobs to set the required spindle speed and feed speed. Next, loosen the
knob (
2
, Fig. 12), lower the chip guard (
3
), and then tighten the knob in this position.
Fig. 12.
Starting the work
Put the workpiece on the right side. Press the workpiece to the vertical and
horizontal base and move it to the direction (
4,
Fig. 12) to put it under the feed wheel.
After the first pass, move the vertical base away to get the correct gap for the next
pass. Between the vertical base and the horizontal base, put the bevel height gauge
related to the angle. On the gauge scale, read the bevel height related to the gap.
Make sure that the vertical base is not in contact with the milling head.
1
2
3
5
4