background image

756.409 | Z02 | 16.31

11

4.4  Making changes to the system

Master and slave(s) are identical inverters. Their function in the system is deter-
mined by the connection to the parallel box:

Master:  

"Solarix Inverter Master" data input and "Master L/N" voltage input

Slave(s):  

"Solarix Inverter Slave" data input and "Slave L/N" voltage input

 WARNING

Danger of explosion from sparking! Danger of electric shock!

Plugs and cables must not be disconnected when voltage is present!

 

X

Before pulling out plugs or disconnecting cables make sure that no loads are 
connected and the inverters are disconnected from the battery.

 

X

The cables pre-fitted to the inverters must not be extended.

4.4.1 Replacing inverters

Proceed as follows when replacing the master or a slave:

 

X

Make sure that no loads are connected and the inverters are disconnected 
from the battery.

 

X

Pull out the RJ45 plug at the relevant data input.

 

X

Open the cover on the parallel switch box.

 

X

Disconnect the input of the relevant master or slave at the parallel switch 
box.

 

X

Connect the new master or slave, as described in Section 4.2.

4.4.2  Using a slave as the master

If the master fails, a slave can be used as the new master. 

 

X

Make sure that no loads are connected and the inverters are disconnected 
from the battery.

 

X

Pull off RJ45 plugs of all data inputs.

 

X

Open the cover on the parallel switch box.

 

X

Disconnect all the cables at the parallel switch box.

 

X

Connect the reconfigurated system as described in Section 4.2.

5 Operation

In parallel operation the power supply is regulated by the rotary switch on the 
master, see the Steca Solarix PI operating instructions. 

The rotary switches at the slaves do not have any function. However, they must 
be in the “Off” position because otherwise the slaves may eventually become 
operational unintentionally.

5.1  Rotary switch settings

Master

Slave(s)

Inverter state

Off

Off

Master and slaves switched off

Standby

Off

Load-dependent response of master and slaves, where 
applicable

On

Off

Master always switched on, slaves switched on as 
required

All On

Off

Master and slaves always switched on

This setting is recommended for high performance 
devices (at the performance limit), e.g. for operating a 
washing machine

 

EN

Содержание PA Link1

Страница 1: ...Installation and operating instructions PA Link1 parallel switch box 756 409 Z02 16 31 EN...

Страница 2: ...3 Behaviour in the case of faults 6 2 4 Exclusion of liability 6 3 Description of the connections 7 4 Installation 7 4 1 Mounting 8 4 2 Connection 9 4 3 Function test 10 4 4 Making changes to the sys...

Страница 3: ...tch box on 115 V or 230 V see table below One stand alone inverter works as a master the others as slaves The PA Link1 has one output for AC consumers AC OUT Example of a possible application A D C B...

Страница 4: ...riants 1 About these instructions These operating instructions are part of the product X Read these operating instructions carefully prior to installation and use X keep them near the product during i...

Страница 5: ...r bodily injury ATTENTION Possible threat of danger Property damage 1 3 3 Notes NOTES Note on easier and safer working habits X Measures for easier and safer working habits 1 3 4 Other symbols and mar...

Страница 6: ...nty of water X If acid splashes into the eyes immediately rinse with plenty of water and seek medical advice 2 3 Behaviour in the case of faults DANGER The connected inverters do not appear to functio...

Страница 7: ...consumer Data input Solarix PI master RJ45 Data input Solarix PI slave 1 3 3 RJ45 Cable output AC OUT consumer Cable input Solarix PI AC master Cable input Solarix PI AC slave 1 3 4 Installation Examp...

Страница 8: ...cm above and below to allow free air circu lation Enough clearance for the type plate to be visible on the installed device 4 1 2 Mounting the PA Link1 parallel switch box X Unscrew 2 screws 1 on the...

Страница 9: ...ntry specific regulations In the event that due to local regulations or the AC consumers grounding is required X Carry grounding out following the adjacent diagram if TN net is permit ted X Tighten th...

Страница 10: ...electric shock X Before connecting the inverters make sure that no load is switched on and all the inverter rotary switches are set at Off X The cables pre fitted to the inverters must not be extende...

Страница 11: ...lel switch box X Connect the new master or slave as described in Section 4 2 4 4 2 Using a slave as the master If the master fails a slave can be used as the new master X Make sure that no loads are c...

Страница 12: ...eight 0 8 kg Connectable devices Maximum of 4 stand alone inverters of the same type and variant Solarix PI 500 12 60 L60 Solarix PI 550 24 60 L60 Solarix PI 1100 24 60 L60 Solarix PI 1500 48 60 L60 C...

Страница 13: ...y cable X Connect the power cable only after completion of all work X Ensure that the data cable is inserted properly X If LED does not light up replace the data cable X If LED does not light up repla...

Страница 14: ...mages are excluded unless liability is obligatory by law They will help you with all is sues you may have Steca Elektronik GmbH Mammostrasse 1 87700 Memmingen Germany Fon 49 8331 8558 833 Fax 49 8331...

Страница 15: ......