756.409 | Z02 | 16.31
10
X
Tighten the screws of all strain reliefs.
X
Insert the cover of the terminals from the top into the casing’s slot, swivel
downwards and fasten with two screws.
4.2.3 Connecting the data lines to Solarix PI stand-alone inverters
X
Plug the red data cable’s RJ45 plug of the Solarix PI master into the "Solarix
Inverter Master" socket.
X
Plug the grey data cables’ RJ45 plugs of the Solarix PI slaves into the
"Solarix Inverter Slave" sockets.
NOTE
X
Check that the locking mechanisms of the RJ45 plugs are engaged.
4.2.4 Connecting the inverter to the battery
WARNING
Danger of explosion from sparking! Danger of electric shock!
X
Before connecting the inverters, make sure that no load is switched on and all
the inverter rotary switches are set at "Off".
X
The cables pre-fitted to the inverters must not be extended.
X
Switch all the inverter rotary switches to the "Off" setting
X
Connect the inverters to the battery in accordance with the Steca Solarix PI
operating instructions.
The installation of the system is now complete.
4.3 Function
test
X
Turn rotary switches on all inverters to "Off".
X
Turn rotary switch on master to "All on".
Z
The system is working correctly when the LEDs on all inverters light up
or blink green.
Z
If the LED of an inverter does not light up or blink green, proceed as
described in the section "Fault diagnosis and troubleshooting".
X
To end the function test, switch the master rotary switch to the "Off" set-
ting.
EN
Содержание PA Link1
Страница 1: ...Installation and operating instructions PA Link1 parallel switch box 756 409 Z02 16 31 EN...
Страница 15: ......