756.409 | Z02 | 16.31
8
4.1 Mounting
4.1.1 Mounting location
X
Ensure that the mounting location satisfies the following requirements:
• Mount in a dry, dust-free indoor room.
• Mount on non-flammable substrate on the wall (concrete) with cable outlet
at the bottom.
• The mounting location must be protected from unauthorized access, espe-
cially by small children.
• Minimum clearance of approx. 10 cm above and below to allow free air circu-
lation.
• Enough clearance for the type plate to be visible on the installed device.
4.1.2 Mounting the PA Link1 parallel switch box
X
Unscrew 2 screws (1) on the cover (2) of the terminals.
X
Lift the cover upwards.
X
Mark 4 bores according to the dimensional drawing and drill with Ø 6 mm.
X
Insert dowels and screw M5 screws into the three top bores (1). The screw
heads must be at a sufficient distance to be able to hang the casing.
X
Hang the casing on the three screws.
X
Screw and tighten one M5 screw through the casing bore (2).
A 65 mm
B 70 mm
EN
Содержание PA Link1
Страница 1: ...Installation and operating instructions PA Link1 parallel switch box 756 409 Z02 16 31 EN...
Страница 15: ......