Communication Cable Replacement
Tools and Materials Required:
Phillips head screwdriver
3/32-in. Allen wrench
Tape
Remove the front shroud:
i
NOTE: DO NOTpulI
on the wires when dis-
connecting the com-
munication cable from
the
LeB.
1.
Using Phillips head screwdriver, remove the eight Phillips head screws from the front
shroud.
2.
Lift the front shroud off the unit.
Disconnect the communication cable from the
LeB:
1.
CAREFULLY disconnect the communication cable from LCB connector J1 by grasping
and pUlling the cable connector. See Diagram 8
DISCONNECT
Jl
\
I
/
/
Diag.B
Remove the display panel:
1.
Using 3/32-in. Allen wrench
I
remove the seven Allen screws from the back of the
J
panel. BE SURE to support the display panel after the Allen screws have been removed.
Elliptical Edge Service Manual
5.3
Содержание Elliptical Edge
Страница 8: ......
Страница 14: ......
Страница 26: ......
Страница 28: ......
Страница 59: ...Page 1a ET FRAME ASSY ell...
Страница 61: ...Page 2a ELECTRICAL KIT ET w o z...
Страница 63: ...Page3a SHROUD KIT ET...
Страница 65: ...Page 4a CRANK ASSY ET...
Страница 67: ...Page Sa Transmission Assy ET...
Страница 69: ...Page 6a EEDIS YKIT...
Страница 71: ...Page Sa RAIL ASSEMBLY KIT...
Страница 73: ...8 Pl 4 PER BRACKET 14 FOR UPPER BRACKET NOTSHOWN I 2 4 Pl 2 PER BRACKET 0 llJ Q CD D1 r z o r f m f...
Страница 74: ......