Waukesha Cherry-Burrell
Maintenance
October 2005
95-03057
Page 51
10. Lower lift arm slightly to allow tube to move down.
At the 12, 6, 3, and 9 o’clock positions, tube flange is
threaded for jack screws. Thread two (2) bolts into
either the 12 & 6 or 3 & 9 o’clock positions.
11. Tighten bolts about 1/2 turn alternately on each side
until flange loosens from jacket. It may be necessary
to lower foot on hydraulic cylinder slightly while
removing tube from jacket.
12. Lower head and tube assembly and service as
required.
13. Lubricate and install new O-rings on both ends of
tube.
14. Install new packing ring (on steam or liquid tubes).
15. To reinstall tube, reverse the procedure.
16. Torque bolts to 240 in-lbs (20 ft-lbs).
NOTE:
Care must be taken to orient tube flange holes to
line up with holes in jacket.
Figure 45 - Insert Jack Screws
Figure 46 - Lower Tube and Service
Содержание Waukesha Cherry-Burrell Votator II
Страница 64: ...Parts Lists Waukesha Cherry Burrell Page 64 95 03057 October 2005 Single Mechanical Seal...
Страница 66: ...Parts Lists Waukesha Cherry Burrell Page 66 95 03057 October 2005 Double Mechanical Seal...
Страница 68: ...Parts Lists Waukesha Cherry Burrell Page 68 95 03057 October 2005 Vertical Refrigeration Piping...
Страница 73: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page73 Addendum Votator II General Assembly...
Страница 74: ...Addendum Waukesha Cherry Burrell Page 74 95 03057 October 2005 Horizontal Refrigeration Assembly...
Страница 75: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page75 Vertical Refrigeration System...
Страница 76: ...Addendum Waukesha Cherry Burrell Page 76 95 03057 October 2005 Horizontal Frame Options...
Страница 77: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page77 Vertical Mounting Pole Hydraulics...
Страница 78: ...Addendum Waukesha Cherry Burrell Page 78 95 03057 October 2005 Vertical Hydraulic Schematic...
Страница 83: ......