Waukesha Cherry-Burrell
Installation
October 2005
95-03057
Page 13
Flush Water Requirements
The double mechanical seal
must be flushed
anytime the
mutator shaft is rotated. Failure to do this will result in
rapid seal failure due to excessive contaminate and heat
build up.
The fluid flow should be in the range of 5 to 10 gallons per
hour, at a temperature of 80°F - 120°F (25°C - 49°C).
Piping to seals should be in the bottom of head and out the
top, piped with parallel flow, never in series.
Piping
Guidelines for Piping
Refer to the general assembly drawings in this manual for
jacket connection sizes and locations, and suggested
media piping drawings.
•
Support ALL piping independently.
•
Provide for line expansion and contraction.
•
Install a safety valve to protect jacket.
CAUTION:
The safety valve should be installed
on the discharge side of product pump for safety
and equipment protection.
DANGER:
Do not install any positive shutoff
valves downstream of the Votator II unit.
WARNING:
Do not allow a volume of liquid to
become isolated in the jacket without relief
protection. Thermal expansion created as liquid
warms can generate enough force to crush tube,
causing damage to internal components and drive
system.
•
Provide temperature indicators on both sides of
Votator II unit.
•
Provide pressure gauge on discharge side of pump.
•
When using liquid coolant, provide a method to
introduce heating media into jacket to thaw
overcooled product.
•
Provide liquid coolant system bypass line around unit
to allow coolant system to be brought down to
operating temperature without circulating coolant
through jacket.
Содержание Waukesha Cherry-Burrell Votator II
Страница 64: ...Parts Lists Waukesha Cherry Burrell Page 64 95 03057 October 2005 Single Mechanical Seal...
Страница 66: ...Parts Lists Waukesha Cherry Burrell Page 66 95 03057 October 2005 Double Mechanical Seal...
Страница 68: ...Parts Lists Waukesha Cherry Burrell Page 68 95 03057 October 2005 Vertical Refrigeration Piping...
Страница 73: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page73 Addendum Votator II General Assembly...
Страница 74: ...Addendum Waukesha Cherry Burrell Page 74 95 03057 October 2005 Horizontal Refrigeration Assembly...
Страница 75: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page75 Vertical Refrigeration System...
Страница 76: ...Addendum Waukesha Cherry Burrell Page 76 95 03057 October 2005 Horizontal Frame Options...
Страница 77: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page77 Vertical Mounting Pole Hydraulics...
Страница 78: ...Addendum Waukesha Cherry Burrell Page 78 95 03057 October 2005 Vertical Hydraulic Schematic...
Страница 83: ......