Maintenance
Waukesha Cherry-Burrell
Page 50
95-03057
October 2005
6. Raise shaft slowly, tucking blades into shaft while
shaft and blade assembly is being inserted into tube.
NOTE:
If lift binds, STOP and back off hydraulic
pressure. Check that blades have not swung fully out and
are not binding on the edge of alignment tool. If this
happens, check blades and replace as necessary. Restart
lift, taking care to guide blades into alignment tool.
7. If blade aligning tool is not used, the individual
controlling hydraulic lift should use one hand to guide
each pair of blades into tube.
8. As shaft is raised into gear reducer, it may be
necessary to rotate shaft slightly to assure splines are
meshed correctly.
9. Continue to raise shaft until head is about six (6)
inches from being engaged.
10. Once the last set of blades has been started in tube,
remove alignment tool, if used.
11. Continue to raise head slowly, aligning teeth of head
with spaces of tube. Raise and turn head so teeth are
engaged and product port is facing forward.
12. Close locking latch. See Figure 42.
13. Install product piping and electrical connections.
Heat Exchanger Tube Removal -Vertical Unit
The hydraulic lift on the vertical unit can be used to
remove the heat transfer tube from the jacket of the unit.
DANGER:
Before removing the heat exchanger
tube from the jacket, all refrigerant must be
evacuated from the jacket assembly.
1. Remove mutator shaft from unit as described in this
section.
2. Remove shaft and head from hydraulic lift.
3. Place assembly on a table or maintenance frame.
4. Remove the driven end product head.
5. Remove the three (3) bolts holding front jacket cover
in place.
6. Remove the non-driven product head from mutator
shaft.
7. Reattach head to tube. See Figure 44. Reattach shaft
nut cover and clamp, and use lift to position non-
driven end head.
8. Loosen bolts on jacket flange.
9. Lower head slightly with hydraulic cylinder to allow
tube to move down.
NOTE:
Tube may slide out easily or it may need
coaxing out.
Figure 42 - Close Locking Latch
Figure 43 - Remove Front Jacket Cover Bolts
Figure 44 - Head Reinstalled
Содержание Waukesha Cherry-Burrell Votator II
Страница 64: ...Parts Lists Waukesha Cherry Burrell Page 64 95 03057 October 2005 Single Mechanical Seal...
Страница 66: ...Parts Lists Waukesha Cherry Burrell Page 66 95 03057 October 2005 Double Mechanical Seal...
Страница 68: ...Parts Lists Waukesha Cherry Burrell Page 68 95 03057 October 2005 Vertical Refrigeration Piping...
Страница 73: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page73 Addendum Votator II General Assembly...
Страница 74: ...Addendum Waukesha Cherry Burrell Page 74 95 03057 October 2005 Horizontal Refrigeration Assembly...
Страница 75: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page75 Vertical Refrigeration System...
Страница 76: ...Addendum Waukesha Cherry Burrell Page 76 95 03057 October 2005 Horizontal Frame Options...
Страница 77: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page77 Vertical Mounting Pole Hydraulics...
Страница 78: ...Addendum Waukesha Cherry Burrell Page 78 95 03057 October 2005 Vertical Hydraulic Schematic...
Страница 83: ......