Operation
Waukesha Cherry-Burrell
Page 30
95-03057
October 2005
Refrigeration Applications - Pumped and
Gravity Systems
1. Start product pump using product or compatible
liquid, such as water.
2. After product flow is established, start Votator II
mutator shaft motor.
Do not run Votator II without
product flow.
3. Turn cylinder refrigeration "on".
4. Adjust back pressure control valve on accumulator to
approximately 20 psig above normal operating
pressure.
5. Gradually reduce setting on back pressure control
valve to obtain proper product temperature.
6. If running material other than product, switch to
product and adjust to desired processing rate.
7. When operating conditions have been reached,
redirect product to desired out-flow point.
PLC Maintenance Setup and Startup
Procedures for Refrigeration
If a Votator PLC Control Panel was purchased for the
Votator II unit, it must be configured prior to the first use
to set up the freeze protection system for refrigeration
units. From the Main Screen select the Maintenance
pushbutton.
STARTUP SUMMARY
REFRIGERATION
Establish seal flush flow (if required).
Turn refrigerant "ON".
Start product or water flow.
Start mutator shaft.
Establish operating pressure (if required).
Turn cylinder refrigeration "ON".
Adjust refrigeration PSIG.
Adjust media for desired product temperature.
Redirect product flow (if necessary).
Enter 1234 as the password and you will be taken to a Maintenance screen.
Содержание Waukesha Cherry-Burrell Votator II
Страница 64: ...Parts Lists Waukesha Cherry Burrell Page 64 95 03057 October 2005 Single Mechanical Seal...
Страница 66: ...Parts Lists Waukesha Cherry Burrell Page 66 95 03057 October 2005 Double Mechanical Seal...
Страница 68: ...Parts Lists Waukesha Cherry Burrell Page 68 95 03057 October 2005 Vertical Refrigeration Piping...
Страница 73: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page73 Addendum Votator II General Assembly...
Страница 74: ...Addendum Waukesha Cherry Burrell Page 74 95 03057 October 2005 Horizontal Refrigeration Assembly...
Страница 75: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page75 Vertical Refrigeration System...
Страница 76: ...Addendum Waukesha Cherry Burrell Page 76 95 03057 October 2005 Horizontal Frame Options...
Страница 77: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page77 Vertical Mounting Pole Hydraulics...
Страница 78: ...Addendum Waukesha Cherry Burrell Page 78 95 03057 October 2005 Vertical Hydraulic Schematic...
Страница 83: ......