![Speck pumps badu jet imperial Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/speck-pumps/badu-jet-imperial/badu-jet-imperial_installation-manual_1341839019.webp)
19
Electrical Installation - continued
Pump Motor: Connect to the No. 10 green headed ground screw provided inside the motor terminal box.
Control Box: Connect to the aluminum grounding terminal strip on the inside of the control box enclosure.
n
n
GROUNDING: Permanently ground the pump motor and control box using a conductor of appropriate size.
CAUTION: DO NOT connect to electric power supply until the unit is permanently grounded.
Power from main panel (230 VAC):
Neutral, Line 1, Line 2
Power to pump motor (230 VAC):
Load 1, Load 2
Connection to remote relay
(120 VAC)
Connection to LED Light
(12 VAC)
Ground connections from
main panel and pump motor
Figure 24
Control Box Wiring Connections
Содержание badu jet imperial
Страница 1: ...Installation Manual BADU JET IMPERIAL Counter Swimming Unit Rev 03 16...
Страница 30: ......