OPERATING MANUAL PAT-806 version 1.08
35
Correct result: I
SUB
< LIMIT
Incorrect result: I
SUB
> LIMIT
Notes:
- Tested device must be turned on.
- Test circuit is electrically isolated from the mains and from PE mains lead.
- Test voltage is 25 V ... 50 V rms
4.7 Measurement of PE leakage current
It is recommended for checking the welding equipment to use the measurements: the
leakage current of the primary circuit and leakage current welding circuit.
Press
I
PE
. After that meter is prepared for
measurement.